BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2026 at 7:00 PM

Updated March 5, 2026

This is a service / maintenance or supply contract in St Paul, Alberta. Contact the soliciting agency for additional information.

The scope of work includes roadside mowing of County road allowances for the County of St. Paul during the summers of 2026, 2027, and 2028, with the possibility of a two-year extension based on satisfactory performance and mutual agreement. The mowing covers more than 2,600 and up to 3,000 kilometers annually, with operations occurring between July 10 and September 15 each year. Mowing consists of first and second passes as applicable, and includes additional width cuts on designated roads. Shoulder mowing requires a 15-foot cut adjacent to both sides of the roadway, or a minimum of 8 feet where a full cut is not feasible. All vegetation, including woody growth up to 1.5 inches in diameter, must be cut uniformly to approximately 4 to 6 inches in height. The work must avoid depositing debris on the road, causing excessive right of way damage, or damaging County infrastructure such as signs and culverts. Any damage caused or observed must be reported to the County as soon as practicable. The County may adjust mowing priorities as operational needs require, and time frames for completion may be adjusted by mutual agreement due to inclement weather. Questions Submission Deadline Fri Feb 20, 2026 4:30 pm (MT) : Questions must be submitted by email please contact the Contact Person Chris Schuh Agriculture and Waste Supervisor cschuh@county.stpaul.ab.ca Address5015 49 Ave St Paul, Alberta CanadaT0A 3A4.

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
30
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

July 15, 2026

Project location map

Multiple Locations, St Paul, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.