Published March 23, 2026 at 8:00 PM

Updated March 24, 2026

Site work and paving for a civil project in Arvada, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

PROJECT 26SR01 Reference Number 0000412855 The City of Arvada is seeking bids from qualified contractors to provide sanitary sewer open cut construction services. The work includes, but is not necessarily limited to: o New piping and appurtenances o Excavation, dewatering, and backfilling o Connections to existing facilities and facilities constructed by others o Pavement patching, pavement replacement, curb and gutter replacement, ADA ramp/sidewalk replacement o Other miscellaneous work and cleanup. All work to be performed under this Contract is located at the areas shown on the attached drawings and summarized by the areas below. A. Within city ROW on W 62 nd and Teller St (Area A) B. Within city ROW on W 62 nd Ave and Newland St. (Area B) C. Within city ROW on Dudley Circle and W 68th Ave. (Area C) D. Within city ROW on W 59 th Ave and Ralston Rd (Area D) E. Within city ROW on W 70 th Ave and Pierce St. (Area E) F. Within city ROW on W 79 th Ave and Lamar St. (Area F) G. Within city ROW on W 78 th Pl and Re ed St. (Area G) H. Within city ROW and Easement on Marshall St and W 55th Pl. (Area H) I. Within city ROW on W 62 nd Ave and Webster St (Area I) The City reserves the right to remove areas at any time before or during construction. 3.02 PRIORITY LOCATIONS The City has identified the below areas to be completed first. These areas will be paved through the City's pavement management project in the summer/fall of 2026 o Priority 1: W 79 th Ave and Lamar St. (Area F) to be completed before June 5, 2026 o Priority 2: W 70 th Ave and Pierce St. (Area E) to be completed before June 5, 2026 o Priority 3: W 78th Pl and Re ed St (Area G) to be completed before July 1, 2026 o Priority 4: Marshall St and W 55 th Pl. (Area H) to be completed before September 1, 2026 The contractor may deviate from the above plan at their discretion assuming all requirements and restrictions are satisfied. The proposed sequencing above is not intended to dictate means and methods for the construction of the project. The City reserves the right to adjust the priority of each location without change in the contract agreement prices, per subsection 1121.05 Changes in Contract Price of the Arvada Engineering Code of Standards and Specifications. 3.03 DESCRIPTION OF WORK The work of this Contract consists of furnishing all labor, materials, equipment, and incidentals required and performing all construction, installation, and testing of all improvements, modifications, and additions, as shown on the Drawings and specified in these specifications. The work includes, but is not necessarily limited to: o New piping and appurtenances o Excavation, dewatering, and backfilling o Connections to existing facilities and facilities constructed by others o Pavement patching, pavement replacement, curb and gutter replacement, ADA ramp/sidewalk replacement o Other miscellaneous work and cleanup. The City reserves the right to stop the project before or during construction. Question Deadline 02/25/2026 at 2:00 PM MT Questions are submitted online Yes, Questions must be submitted through online. Responses will be posted on online via addendum. For additional administrative information not related to the project, contact: Dawn Krank, dkrank@arvada.org Contact with the requesting department may result in vendor disqualification. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 %

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

21

5

2

6

Subscribe For Documents

108 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
126
Bidding Soon
1,260
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

April 13, 2026

Project location map

Multiple Locations, Arvada, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.