BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2026 at 7:00 PM

Updated February 21, 2026

Site work for a transportation facility in Charleston, South Carolina. Working plans call for site work for a transportation facility.

Removal and replacement of 136 individual concrete pavement panels located at the intersection of the primary and secondary runways at Joint Base Charleston-Air Base. Existing panels measuring 25 ft by 25 ft by 24 in deep will be removed and replaced with new panels measuring 25 ft by 25 ft by 26 in deep. Work shall occur nightly during a 6-8-hour window between approximately 2300 and 0700, Thursday through Monday, and must allow the runway intersection to reopen for aircraft operations each morning. Nightly activities include saw cutting, removal and installation of temporary panels, and placement of permanent fast-setting concrete panels capable of achieving aircraft-rated strength within a 3-4-hour cure period. The project requires specialized sawing and removal equipment for 24-inch-thick pavement and sufficient volumetric mixers to place a minimum of 50 cubic yards of fast-setting concrete per shift. Ancillary work includes milling and overlay of asphalt shoulders, installation of new runway centerline and edge lighting within the work limits, installation of runway markings, pavement grinding for smoothness, and pavement grooving. Place of Performance: Joint Base Charleston, SC Postal Code: 29404 Country: USA Dollar magnitude for this contract is greater than $10,000,000.

Final Planning

Transportation Terminals

$10,000,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
2
Bidding Soon
523
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2026

August 20, 2026

Project location map

To Be Determined, Charleston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.