BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2026 at 7:00 PM

Updated February 19, 2026

Demolition, site work and paving for a mixed-use development in Pooler, Georgia. Completed plans call for the demolition of a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; for site work for a road / highway; and sidewalk / parking lot.

The work consists of the demolition and removal from the site of four existing traffic signs and approximately 513 SF of existing sidewalk, 71 LF of existing curb, 45 LF of existing curb and gutter, 178 SF of existing traffic island, 14 SF of existing tactile paving, and 161 LF of existing pavement striping. The contractor shall also furnish and install five concrete ADA ramps, 14 LF of 18" normal curb and gutter, 37 SY of heavy duty asphalt pavement, 1,783 LF of 8" thermoplastic crosswalk striping, 243 LF of 4" thermoplastic skip striping, 114 LF of 4" thermoplastic solid striping, 142 LF of 24" thermoplastic stop bar, three GDOT Type 3 thermoplastic turn arrows, street signage, 1,125 LF of 2" conduit, 244 LF of 6" directional bore, and the traffic signal and control boxes complete and ready to operate. All pavement markings shall be thermoplastic. The work area is at the intersection of Benton Boulevard and West Mulberry Boulevard/Towne Center Drive, occurring within the designated road right of way and construction easements. The contractor is responsible for providing traffic control at the site and for the offsite disposal of all items/debris to be demolished or removed. Bidders must be able to demonstrate a minimum of 5 years of municipal work experience in drainage improvements and canal maintenance. Insurance certificates, a 5% bid bond from a surety authorized to conduct business in the State of Georgia or a certified/cashier's check, and a non-collusion affidavit must be completed and submitted with the bid. All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer. Questions must received before 11th March 2026.

GC Bidding

Roads / Highways

$300,000.00

Public - City

Demolition, Paving, Site Work

10

12

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
67
Bidding Soon
692
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

April 17, 2026

Project location map

Benton Blvd & W Mulberry Blvd, Pooler, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.