BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Site work and paving for a bridge / tunnel in Collinwood Township, Minnesota. Completed plans call for site work for a bridge / tunnel.

The project is for culvert lining on County State Aid Highway (CSAH) 15. The major item is 157 linear feet of lining culvert pipe (58" Span) Special. Bids shall be submitted electronically through bidVAULT. Plans and proposals may be examined at the office of the County Highway Department or online. The cost to download the plan and proposal is $25 plus tax, and a hard copy is $100 plus tax, payable to Crow Wing County by check, draft, or money order. STARTING DATE: May 1, 2026 COMPLETION DATE: September 30, 2026

Award

Bridges / Tunnels

$113,275.00

Public - County

Paving, Site Work

5

7

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
1
Bidding Soon
853
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

May 1, 2026

Project location map

County Rd 15, Collinwood Township, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.