Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 17, 2026 at 7:00 PM
Updated February 18, 2026
Site work and paving for a mixed-use development in Kirkwood, Missouri. Conceptual plans call for site work for a sidewalk / parking lot; road / highway; sidewalk / parking lot; and water / sewer project.
The project involves four components: 1) Construction of new concrete curb and guttering (preferably rolled type), pavement milling, base repairs, and asphalt overlay along five streets. Two of these streets include sidewalk and ADA ramp repairs and/or replacement. 2) Crack seal, micro sealing, and pavement markings along one street; this street also has sidewalk reconstruction. 3) Replacement of concrete street slabs along two streets. 4) Construction of stormwater improvements along one street. Retaining wall design or construction is not anticipated but may become necessary depending on survey and design needs. All questions shall be submitted in writing to Terry Jones, Public Works Superintendent at tiones@glendalerno.org before 10:00 a.m., February 5, 2026. The method of Contractor Selection has not been Determined at this time. Component #1 $1,464,466.00 Component #2 $454,088.00 Component #3 $117,500.00 Component #4 $160,000.00
Conceptual
Roads / Highways
$2,196,054.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2027
Multiple Locations, Kirkwood, MO
Related To This Project
Kirkwood, MO
Bid Date: Feb 25 2026
Kirkwood, MO
Bid Date: Mar 03 2026
Kirkwood, MO
Bid Date: Feb 06 2019
Kirkwood, MO
Bid Date: Feb 12 2026
Kirkwood, MO
Bid Date: Feb 13 2026
Kirkwood, MO
Bid Date: Feb 06 2026
Kirkwood, MO
Bid Date: Feb 05 2026
Kirkwood, MO
--
Kirkwood, MO
Bid Date: Feb 06 2026
Kirkwood, MO
--
Kirkwood, MO
Bid Date: Oct 23 2025
Kirkwood, MO
Bid Date: Jan 23 2026
Kirkwood, MO
Bid Date: Sep 23 2025
Kirkwood, MO
--
Kirkwood, MO
Bid Date: Oct 01 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
