Published February 19, 2026 at 7:00 PM
Updated February 20, 2026
Site work for a mixed-use development in Groton, Connecticut. Completed plans call for site work for a playground / park / athletic field; and playground / park / athletic field.
Redevelopment of Sutton Park including new walkway, playground equipment, EV charging stations, drainage improvement, new bathroom facility, improvements to the existing skate park, and other improvements as shown on Contract Plans. Each bidder must deposit, with their bid, security in the form of bid bond or certified check subject to the conditions provided in the Information for Bidders. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. Question Deadline 02/27/2026 All questions about the meaning or intent of the Contract Documents are to be directed to the Owner at cdennis@groton-ct.gov / (860) 448-4068. Interpretations or clarifications considered necessary by the Owner in response to such questions will be posted to the Towns website The Project will be constructed in a single phase under one contract. 1. Skate Park: The project consists of improvements to the existing skate park at the property known as Sutton Park. Work included, but not limited to, stormwater conveyance improvements, renovation and expansion to the existing skate park, installation of concrete walkways, retaining walls, railings, wayfinding signage, shade sails, and erosion and sediment control measures shown and described in the Contract Documents. 2. Park Improvements: The Project consists of improvements to the existing property known as Sutton Park and include, but not limited to; new and relocated parking areas, selective clearing and grubbing, stormwater conveyance improvements, construction of new bocce courts, construction of multi-use bituminous trail, new facilities building, nature based playground with synthetic safety surfacing and playground equipment, concrete walkways, boulder and timber steppers, site furnishes, construction of new basketball court with new surface coating on existing basketball court, installation of concrete walkways, retaining walls, railings, wayfinding signage, installation of trees, shrubs, plantings and seed mixes, park lighting, and temporary erosion and sediment control measures as shown and described in the Contract Documents.
GC Bidding
Playgrounds / Parks / Athletic Fields
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2026
April 13, 2026
185 Fort Hill Rd, Groton, CT
Related To This Project
Groton, CT
Bid Date: Feb 20 2026
Groton, CT
Bid Date: Mar 19 2026
Groton, CT
Bid Date: Mar 12 2026
Groton, CT
Bid Date: Mar 04 2026
Groton, CT
Bid Date: Feb 25 2026
Groton, CT
Bid Date: Feb 11 2026
Groton, CT
Bid Date: Jan 22 2026
Groton, CT
Bid Date: Jan 23 2026
Groton, CT
Bid Date: Jan 08 2026
Groton, CT
Bid Date: Jan 08 2026
Groton, CT
--
Groton, CT
Bid Date: Feb 04 2026
Groton, CT
Bid Date: Feb 03 2026
Groton, CT
Bid Date: Jan 08 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.