BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a transportation facility in Groton, Connecticut. Completed plans call for site work for a transportation facility.

The project consists of the removal and disposal of one 4,000-gallon single wall fiberglass reinforced concrete underground fuel oil tank in front of the airport terminal building, including the installation of a temporary 2,000-gallon rectangular aboveground fuel oil tank with connections to the terminal building's existing boiler system. The project also includes the removal, disposal, and replacement of a 1,000-gallon oil/water separator at the airport's maintenance facility. The contract time for completion of all work is within one hundred calendar days from the date specified in the Notice to Proceed. A mandatory pre-bid conference and site visit is required for bidders. It is strongly recommended that bidders attend the site visit to familiarize themselves with the scope of work and site restrictions. No claims for extra costs will be allowed due to lack of knowledge of verifiable conditions. Attendees arriving more than ten minutes late may be considered as not having attended the conference. Question Deadline 04/16/2026 at 11:00 AM ET During the period from advertisement of this Invitation for Bid (IFB) and until a Contract is awarded, Bidders shall not contact any employee of the CAA concerning this procurement except in writing via online.

Bid Results

Transportation Terminals

$525,000.00

Public - State/Provincial

Site Work

19

15

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 1, 2026

Project location map

155 Tower Ave, Groton, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.