BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2026 at 8:00 PM

Updated March 18, 2026

Site work and paving for a road / highway in Oregon, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Road and Bridge Committee reserves the right to accept or reject any or all bids. HMA Surface, Bituminous Materials (Tack Coat), HMA Surface Removal - Butt Joints, Paint Pavement Markings and Traffic Control. This project consists of a 2" bituminous overlay over Barker Road from the Byron City limits to Short Road in Byron Township. The project also includes bituminous materials (tack coat), HMA pavement removal - butt joints, paint pavement markings and traffic control. All work shall be completed before September 25, 2026. This work shall be done in accordance with the applicable provisions of Section 406 of the Standard Specifications for Road and Bridge Construction. Asphalt SS-1h shall be used for BITUMINOUS MATERIALS (TACK COAT) on all bituminous surfaces, and shall be applied at a rate of 0.050 lbs/sf over existing pavement or to the satisfaction of the Engineer. This work shall be paid for at the contract price per Pound for BITUMINOUS MATERIALS (TACK COAT).

Award

Roads / Highways

$198,374.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
10
Bidding Soon
2,497
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2026

April 6, 2026

Project location map

Multiple Locations, Oregon, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.