BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a mixed-use development in La Prairie, Quebec. Completed plans call for the renovation of a educational facility.

Reference number: 20124152 Deadline for receipt of complaints 2026-03-02 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 22 Briefly, the work covered by this contract includes, but is not limited to, the supply of materials and labour in order to carry out all the renovation work on the St-Joseph Building at the Notre-Dame-Saint-Joseph School, including: - The modification of land slopes for water drainage (see civil documents and structure); - The occasional repair of the schoolyard and playgrounds (see civil documents and structure); - The demolition of elements of the exterior envelope of existing buildings identified in architectural and structural documents; - The demolition of existing interior elements identified in architectural, structural, mechanical and electrical documents; - The demolition of the elements identified in the structural, civil, mechanical, electrical and landscaping documents; - The execution of all works related to the construction and installation of the structural, civil, mechanical, electrical, and landscaping elements identified in the documents of the different disciplines. - The execution of all works necessary for the completion of the work required by this contract, even if they are not specifically mentioned in the plans and specifications. Phase 1 - May 2026: Start of work phase 1-A - Exterior - June 24, 2026: Start of work phase 1-B - Interior (mobilization inside and outside) - August 21, 2026: End of work during the summer vacation period and early takeover for interior works). - October 30, 2026: End of phase 1 work - Early takeover. Phase 2: - May 2027: Start of work phase 2-A - Exterior - June 24, 2027: Start of work phase 2-B - Interior (mobilization inside and outside) - August 20, 2027: End of the work during the summer vacation period and early takeover for the interior works - November 1, 2027: End of phase 2 work - Reception with reservations A non-mandatory but highly recommended site visit is scheduled for February 24, 2026 at 13:00. The assembly point for this visit is set at Notre-Dame-St-Joseph school_Edificate St-Joseph at 320, rue Saint-Charles, La Prairie J5R 2N9

Award

Educational

$3,747,565.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
707
Active Projects
464
Bidding Soon
4,200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

May 1, 2026

Project location map

310 Bd Taschereau, La Prairie, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.