Published April 20, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a civil project in Davis Junction, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Channel Excavation (278 CY); Erosion Control Blanket (1222 SY); Temp Ditch Checks (80 FT); Perimeter Eros Bar (537 FT); Stone RipRap Class A5 (707 SY); Filter Fabric (707 SY); HMA BC IL-19.0 N50 (129 TON); HMA SC IL-9.5 C N50 (74 TON); Pavement Removal (656 SY); Aggregate Shldrs, Ty B (66 TON); Remove Existing Structure (1 EA); Structure Excavation (90 CY); Concrete Structure (59.4 CY); Concrete Encasement (74.1 CY); PP Concrete Deck Beam 17" DP (2812 SF); Rebar, Epoxy Coated (13120 FT); Steel Railing, TY SM (210 FT); FUR M S PILE 14x0.312 (720 FT); Driving Piles (720 FT); Test Pile Metal Shells (4 EA); Name Plates (1 EA); Granular Backfill STR (58 CY); Geocomposite Wall DR (40 SY); Conc Headwall For Pipe Drain (4 EA); Pipe Underdrain for Structures 4" (147 FT); Mobilization (1 LS); Construction Layout (1 LS); Earth Ex Special (299 CY); Seeding, Class 2A Spl (0.28 AC); Concrete Wearing Surface, 5" (313 SY); Traffic Control & Protection Special (1 LS) Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. IL DOT - Channel Excavation, Erosion Control Blanket - Big Mound Road This project consists of replacement of the existing three span (30'-11 1/4 ", 31'-8", and 30'-11 1/4 ") precast prestressed concrete deck beam bridge with the three span (32'-10", 33'-6", and 32'-10") precast prestressed concrete deck beam on spill-thru abutments, with ditch works and approach roadway works. In-stream work includes removing the existing bridge, constructing the proposed bridge and placement of scour protection countermeasures at the abutments/wingwall slopes. Improvement to the roadway includes reconstruction of the approach pavement and grading improvements to the roadside ditches. Location Southwest Quarter of Section 30, Township 42 North, Range 1 East of 3rd P.M.

Award

Roads / Highways

$958,662.00

Public - County

Paving, Site Work

70

5

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
721
Active Projects
369
Bidding Soon
5,682
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2026

May 11, 2026

Project location map

Multiple Locations, Davis Junction, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.