BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2026 at 7:00 PM

Updated February 19, 2026

Renovation of a laboratory facility in Forest Park, Georgia. Working plans call for the renovation of a laboratory facility.

Primary facilities include administration areas, laboratory space, a facility support area, a covered hardstand mobile laboratory area, organizational vehicle parking, Intrusion Detection System installation, a mass notification system, and Utility Monitoring and Control System connections. Supporting facilities include site development, utilities, a limited backup power source and associated connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping, and signage. Heating and air conditioning will be provided by a self-contained system. Building information systems are unique and not included in the unit cost of the building. Measures in accordance with Department of Defense Minimum Antiterrorism for Buildings standards, along with enhanced AT/FP features, will be incorporated. Comprehensive building and furnishings-related interior design services are required. Access for individuals with disabilities will be provided. Cyber security measures and sustainability/energy measures will be incorporated. Facilities will be designed for a minimum 40-year service life in accordance with UFC 1-200-02, including energy efficiency, building envelope performance, and integrated building systems requirements. Air conditioning is estimated at 236 tons. The estimated magnitude of construction is between $25,000,000 and $100,000,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Laboratories

$100,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
168
Bidding Soon
1,942
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2026

Project location map

4930 N 31st St, Forest Park, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.