Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 18, 2026 at 7:00 PM
Updated February 19, 2026
Site work and paving for a mixed-use development in Arlington, Wisconsin. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.
Limit : Various Brdgssth 78, 60 Two structures need treatment to extend their service lif Perpetuation project for structural work on B-11-87 on STH 60 over Wisconsin River overflow and B-56-55 on STH 78/STH 113 over Gallus Slough. Both will have primary work of concrete deck overlays with deck prep. B-11-87 work will also include patching bottom of deck, and areas of concrete surface repair on the corner of abutment and wing, along the top of curb and parapet corner. B-56-55 work will also include concrete repairs to abutment corners and corner of rail. Anticipated Construction Cost: $750,000-$999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - SW Regionwide, Concrete Overlays *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Bridges / Tunnels
$999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
WI-60 Trunk, Arlington, WI
Related To This Project
Arlington, WI
Bid Date: Mar 06 2026
Arlington, WI
Bid Date: Feb 05 2026
Arlington, WI
Bid Date: Aug 28 2025
Arlington, WI
Bid Date: Jan 10 2025
Arlington, WI
--
Arlington, WI
Bid Date: Aug 03 2021
Arlington, WI
Bid Date: May 16 2019
Arlington, WI
Bid Date: Aug 17 2021
Arlington, WI
--
Arlington, WI
Bid Date: Jun 19 2023
Arlington, WI
Bid Date: Jun 13 2023
Arlington, WI
Bid Date: Feb 25 2025
Arlington, WI
Bid Date: Feb 09 2023
Arlington, WI
Bid Date: Jan 10 2023
Arlington, WI
Bid Date: Jan 31 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
