BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 25, 2026 at 7:00 PM

Updated March 12, 2026

Renovation of a medical facility in Fort Worth, Texas. Completed plans call for the renovation of a medical facility.

General contractor services are required for the Oncology & Infusion Center (OIC) Linac Replacement project. Respondents are encouraged to attend the Pre-Proposal Conference. Any respondent who submits a proposal without attending the scheduled Pre-Proposal Conference does so at its own risk. No request for interpretation or clarification or question will be answered if submitted after 12:00 pm (Noon), Central Time, on February 25, 2026 All Submission Questions must be electronically submitted via file upload at this website Install conductors in a neat and workmanlike manner to meet code requirements and make runs continuous without weld, splice, or joint between boxes. Do not install wires in conduit unless the entire system of conduit and outlet boxes is permanently in place. Pull conductors using a UL approved wire lubricant. B. Provide conductors continuous from outlet to outlet with no splices except at outlets. Leave sufficient wire at all outlets to make connections without straining. C. Deliver cable and wire to the project in original packages. Conductors with insulation showing deterioration within one year after final completion and acceptance of the Work shall be removed and replaced at no cost to Owner. D. Thoroughly clean wires before installing lugs and connectors. E. Make splices, taps and terminations to carry full ampacity of conductors without perceptible temperature rise. F. Terminate spare conductors with electrical tape. G. Torque test conductor connections and terminations to manufacturer's recommended values. H. Where outlets only are indicated, leave 48-in. leads of conductors, for connection to equipment. Identify all conductors circuit numbers with Brady tape at terminals and junctions. I. Where more than three current-carrying conductors are installed in a raceway, use larger size conductor and appropriate larger size raceway to comply with Article 310 of the National Electrical Code. J. Where conductor is installed in an environment where the ambient temperature will exceed 86degree F, use larger size conductor and appropriate larger size raceway to comply with Article 310 of the National Electrical Code. K. Test all circuits for grounds. Light and test each lamp. Prove and test energy available at the load side of disconnect switches and at the final point of connection to driven equipment. Make all necessary and reasonable tests as required by the Architect to prove the integrity of work and leave the complete electrical installation ready for operation. Provide labor, materials, services, equipment and appliances required in conjunction with the installation of wire connections and devices systems as indicated in the Contract Documents

Post-Bid

Medical

$3,000,000.00

Public - County

Renovation

17

21

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
458
Active Projects
213
Bidding Soon
4,386
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2026

May 10, 2026

Project location map

1450 8th Ave, Fort Worth, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.