BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2026 at 8:00 PM

Updated March 11, 2026

Demolition, site work, paving and new construction of a civil project in Victor, Idaho. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Bridge reconstruction over Fox Creek on W 6000 S and 0.12 miles of road reconstruction. Project consists of approximately 0.7 acres of clearing and grubbing, 480 cy of fill, 1059 cy of excavation, 811.5 cy of pit run, 173 cy of 2" minus, 243 cy of 3/4 " minus, 150 sy of riprap slope and outlet protection, 0.3 ac of seeding, a precast concrete stiffleg culvert and installation, and other miscellaneous work. Scope includes coordinating design and construction of precast culvert. Question Deadline 02/25/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Darryl Johnson, PE, PLS Telephone: (208) 776-8222 Email: djohnson@tetoncountyidaho.gov Questions received less than 7 days prior to the date for opening of Bids may not be answered.

Award

Bridges / Tunnels

$499,448.00

Public - County

Demolition, New Construction, Paving, Site Work

17

8

2

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
1
Bidding Soon
182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

April 3, 2026

Project location map

W 6000 S, Victor, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.