BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 6, 2026 at 7:00 PM

Updated March 7, 2026

Renovation of a municipal facility in Chelsea, Massachusetts. Completed plans call for the renovation of a municipal facility.

The City of Chelsea Department of Public Works is soliciting bids for replacement of two obsolete boilers with one new high efficiency boiler. The boilers are located in a basement maintenance room of Chelsea City Hall, located at 500 Broadway, Chelsea MA 02150. Scope of Work 1. Properly shut down and disconnect existing gas piping, flue pipe and hot water piping. 2. Make safe, disconnect, remove, and dispose of two (2) Caravan Slant-Fin boilers, model GG399HEC. Properly cap the existing flue pipe. 3. Furnish, rig to location, and install one (1) new high efficiency, natural-gas, condensate boiler sufficient to replace the operation of the Caravan boilers, of a model such as the Lochinvar FTX750N, or equivalent. 4. Furnish and install new vent pipe from new boiler terminating through far window. Furnish and install new spiral fresh air pipe from existing boiler room make up air louver to new boiler intake. Insulated fresh air pipe with fiberglass wrap. 5. Furnish and install new grooved hot water piping. Replacing partial 4" header and 2 1/2" boiler feed piping, to include isolation valves, automatic control valve, strainer, temperature wells, pipe and fittings making for a complete operational system per manufacture's recommendations. 6. Furnish and install a new condensate drain system to include condensate neutralizer kit, condensate pump and condensate pipe to existing utility sink. 7. Properly reconnect gas piping from existing gas main to new unit 8. Test, fill and vent new boiler and piping. Insulate new piping as necessary. 9. Perform start up and commissioning, with factory certified technician as required. 10. Be present onsite for initial inspection by the Massachusetts boiler inspector. Deadline for Written Inquiries February 25, 2026 Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

Post-Bid

Municipal

$150,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
749
Active Projects
424
Bidding Soon
3,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2026

April 1, 2026

Project location map

500 Broadway, Chelsea, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.