BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 1, 2026 at 8:00 PM

Updated April 2, 2026

Site work and paving for a sidewalk / parking lot in Somerville, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Each bid shall be accompanied by a bid deposit in an amount equal to five percent (5%) of the total bid price. Provide labor, equipment and materials to overlay existing parking lot pavement. The applicable minority workforce utilization percentage is 15.3 %. The applicable women workforce utilization percentage is 6.9 %. The selected vendor will provide labor, equipment, materials and tools to overlay approximately 38,000 square feet of pavement in area. o The contractor will reclaim/Grind existing asphalt and dispose it properly. o Rebuild top of catch basins/structure with brick and block as necessary. o Level and grade area to achieve proper pitch for drainage. o Install 1 1/2 "Binder course of bituminous concrete/hot mix asphalt and will compact and roll. o Install 1 1/2 "Top Course of bituminous concrete/hot mix asphalt and will compact and roll to a smooth finish. o Remove and reinstall existing cars stop after paving, align and re-pin as necessary. o Add new asphalt curbing where necessary for stability. o Contractor will line stripe the parking lot according with existent layout. o The awarded contractor while striping the lot must follow standards set by the DOT concerning space size and ADA compliance. o The project will be done off hours. o Contractor will obtain and submit all required permits. o Project needs to reflect Prevailing wages. o Contractor will provide police detail and reserve spots on the street to properly move heavy equipment in and out of the property during the project. o The selected vendor's employees must be CORI checked and cleared before the project starts. o After each day of work, the site will be clean and free of any objects, vehicles, etc., that might make parking difficult for tenants. No equipment will be stored on-site. o Contractor will be responsible for relocating the dumpster and move it back after the project is concluded. o No additional costs will be approved for commuting, fuel or other incidental expenses. The contractor may use facility water and electricity.

Bid Results

Sidewalks / Parking Lot

$89,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
778
Active Projects
445
Bidding Soon
3,339
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2026

April 6, 2026

Project location map

175 Fellsway, Somerville, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.