BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Site work for a water / sewer project in Heflin, Alabama. Completed plans call for site work for a water / sewer project.

Separate sealed bids are requested for the installation of an 800 kW diesel generator at an existing water booster station, including generator, concrete pad, automatic transfer switch, SCADA, wiring, and related items. Bids must include security in the amount, form, and subject to the conditions provided in the Information for Bidders. Attention is called to conditions of employment, minimum wage rates, requirements of the State Licensing Board for General Contractors, and Alabama competitive bid laws. The owner reserves the right to waive informalities or reject any or all bids. No bidder may withdraw a bid within 60 days after opening.

Bid Results

Water / Sewer

$451,345.00

Public - County

Site Work

8

15

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
0
Bidding Soon
1,035
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

April 13, 2026

Project location map

4983 Co Rd 24, Heflin, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.