Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 23, 2026 at 8:00 PM
Updated March 24, 2026
Renovation of a sidewalk / parking lot in Hillsboro, Missouri. Completed plans call for the renovation of a sidewalk / parking lot.
**As of March 23rd, 2026 this project has not yet been awarded. A timeline for the award has not yet been established.** Work consists of stair, landing, large pad, and sidewalk removal and replacement on the Hillsboro campus. Jefferson College is soliciting proposals to lawfully contract for concrete repair and replacement on the Hillsboro Campus. Campus Concrete Repair and Replacement o This project includes removal, repair and replacement of concrete in the following locations: o Early Child Care Center o Field House Main Entrance Stair Landing (Landing only) o Fine Arts Building North-East Stair Landing (Landing only) o AS1 Building West Stairs (both entrances) o Early Child Care Center (North side) basketball court and sidewalk APPROX. 2000 sq ft of concrete replacement. o Remove existing concrete o Grade subgrade. Adding type 5 rock as needed to ensure 4 inches of rock o Compact using plate compactor or steel drum roller o Form and pour 4 inches 4000 psi concrete with fiber mesh o Broom finish o Include installation of basketball goal sleeve o Back fill, grade, seed, straw Field House Main Entrance Stair Landing (Landing only) o Excavate existing concrete landing o Install type 5 rock as needed to restore proper base o Compact base using vibraplate o Form and pour 4 inches of 4000 psi concrete with fiber mesh o Control joints to be tooled or early entry saw cut o Broom finish AS1 Building West Stairs (both entrances) o Excavate damaged stairs and remove handrails to be reinstalled o Form stairs as existing layout o Grade to ensure 4 inches of concrete at tread o Pour 4000 psi concrete with fiber mesh Fine Arts Building North-East Stair Landing (Landing only) o Excavate existing concrete landing o Install type 5 rock as needed to restore proper base o Compact base using vibraplate o Form and pour 4 inches of 4000 psi concrete with fiber mesh o Control joints to be tooled or early entry saw cut o Broom finish o Broom finish o Reinstall handrails Each bid shall include a five percent (5%) bid security in the form of a bid bond executed by the bidder and an approved Surety Company. All bidders must provide a sworn affidavit affirming participation in a federal work authorization program and stating that the bidder does not knowingly employ any person who is not authorized to work in the U.S. The contractor must comply with current Prevailing Wage laws and other statutory regulations as referred to in the specifications. This project is tax exempt. A mandatory Pre-Bid Conference will be held at Building & Grounds.
Bid Results
Sidewalks / Parking Lot
$49,735.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
