BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a sidewalk / parking lot in Berwyn, Illinois. Completed plans call for site work for a sidewalk / parking lot.

The proposed improvement consists of P.C. concrete sidewalk removal and replacement, P.C. concrete driveway removal and replacement, combination concrete curb and gutter removal and replacement, and all appurtenant construction at various locations throughout the City. Proposals must be submitted on the forms provided. No proposals or bids will be issued after 12:00 Noon on the specified date before the bid opening. All proposals or bids must be accompanied by a Bid Bond, Cash, or Certified Check made payable to the City of Berwyn in the amount of not less than five percent (5%) of the total amount of the Proposal as a guarantee that if the Proposal is accepted, a Contract will be entered into and the performance of the Contract properly secured. No bid shall be withdrawn after the opening without the consent of the Mayor and City Council for a period of forty-five (45) days after the scheduled time of closing bids. The bidder is advised that the City is a recipient of a grant under the Housing and Community Development Act of 1974. The total cost of the project is funded with federal dollars. All laborers and mechanics must be paid wages at rates not less than those prevailing as determined by the Secretary of Labor and must comply with federal labor standards including the Davis-Bacon Act, Contract Work Hours and Safety Standards Act, and the Copeland "Anti-Kickback Act". Compliance with Equal Employment Opportunity and "Section 3" requirements, which require affirmative action to hire lower income residents and subcontract with local small businesses, is required. A Performance Bond equal to one hundred percent (100%) of the bid is required from the successful bidder. The contractor must provide sufficient insurance or guaranty of indemnity against claims for damages due to negligence during construction until acceptance as complete by the City. Bidders must be registered and active with SAM.gov prior to the bid date. The right to reject any and all proposals is reserved. Est. Completion Date: June 19, 2026

Award

Sidewalks / Parking Lot

$250,176.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
568
Active Projects
277
Bidding Soon
4,660
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

April 18, 2026

Project location map

To be determined, Berwyn, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.