Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 4, 2026 at 7:00 PM
Updated March 5, 2026
Site work and paving for a road / highway in Chandler, Arizona. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
The City of Chandler Invites Qualified Consultants to Submit Statements of Qualifications (Soq's) to Provide Services for This Project. Question Deadline 03/03/2026 at 5:00 PM MT All Solicitation Questions Must Be Emailed to Soq.questions@chandleraz.gov With the Subject Line of city Project No.: St2604.201. Questions Received After the Due Date and Time Will Not Be Considered. The method of Contractor Selection has not been Determined at this time. Request for Proposal for Design Services is Underway Section 1 – Project Description Chandler Boulevard is currently a six-lane arterial roadway that provides three lanes in each direction, separated by a raised median with protected left turn pockets. Chandler Boulevard supports commuting traffic to and from the Loop 101 Price Freeway as well as local traffic associated with homes and businesses between the Loop 101 Price Freeway and Dobson Road. This project will repave 1 mile of Chandler Boulevard between Price Road and Dobson Road. Additionally, the project intent will make American with Disabilities Act (ADA) improvements on sidewalks, curb ramps and driveways. The Project will conduct a Project Assessment including Road Safety Assessment (RSA) and will implement feasible outcomes. This is a federally funded project using FHWA funds. The design and construction will use Arterial Rehabilitation and Reconstruction Program (ARRP) Federal funds. In addition to roadway preservation and ADA improvements, the project corridor includes water utility infrastructure that will require early evaluation. A preliminary utility study will be required to assess the feasibility of replacing the two existing 12-inch water mains with either a single 16-inch water main or two new 12-inch water mains, including impacts to service and lateral reconnections, traffic control requirements, and construction phasing needs. The selected alternative shall then be advanced through final design, specifications, bid-ready construction documents, bidding support, and a final engineer’s opinion of probable construction cost. The city has completed an ADA analysis on the corridor to determine ADA improvements required. More scoping will be conducted after the RSA is completed. Section 2 – Scope of Work The scope of work includes the design of the roadway, water utility infrastructure rehabilitation, and ADA improvements on Chandler Boulevard between Price Road and Dobson Road. The consultant shall provide all labor, materials, equipment, and expertise necessary to prepare complete construction documents and supporting deliverables in compliance with federal, state, and local standards. Professional Services will include data collection, utility coordination, facilitate progress meetings, project management, survey, cost estimates, conceptual pre-design, project assessment reports, public and stakeholder meetings, possible right of way coordination, geotechnical services, environmental services and associated National Environmental Protection Act (NEPA) requirements, permitted plans including phasing plans, specifications, bid schedule with a final cost estimate, and bidding assistance to repave one (1) mile of Chandler Boulevard between Price Road and Dobson Road. The scope shall also include evaluation and coordination of both city-owned and non-city (public and/or privately owned) utilities within the corridor to identify potential conflicts and relocation needs associated with pavement rehabilitation and the water infrastructure improvements. In addition, the consultant shall support completion of the required Roadway Safety Assessment (RSA) and incorporate feasible RSA outcomes into the final design, including coordination and design considerations related to streetlight foundation updates, signing and striping improvements, and identification of feasible fiber optic infrastructure coordination or upgrades where applicable.
Conceptual
Roads / Highways
$4,000,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2026
March 17, 2027
W Chandler Blvd, Chandler, AZ
Related To This Project
Chandler, AZ
--
Chandler, AZ
--
Chandler, AZ
Bid Date: Mar 18 2026
Chandler, AZ
Bid Date: Feb 25 2026
Chandler, AZ
Bid Date: Feb 19 2026
Chandler, AZ
Bid Date: Feb 26 2026
Chandler, AZ
--
Chandler, AZ
Bid Date: Feb 11 2026
Chandler, AZ
Bid Date: Feb 18 2026
Chandler, AZ
Bid Date: Feb 12 2026
Chandler, AZ
Bid Date: Feb 18 2026
Chandler, AZ
Bid Date: Feb 17 2026
Chandler, AZ
Bid Date: Jan 23 2026
Chandler, AZ
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
