Published April 29, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a civil project in Bryant, Arkansas. Completed plans call for site work for a water / sewer project.
The bidders have been added. Please refer to the bid tabulation for detailed results Sealed bids will be received for Water Supply Connection and Transmission Lines and Water Storage Tank. Copies of the plans and specifications are on file and available for public inspection at the specified engineer's office. A set may be obtained from the Engineers upon payment of one hundred dollars ($100.00). Bidding security in the form of a Certified or Cashier's Check or any acceptable bid bond, payable to the Southwest Water Users Public Water Authority, in an amount not less than five percent (5%) of the largest possible total for the bid submitted, must accompany each bid as a guarantee that, if awarded the contract, the bidder will promptly enter into a contract and execute such bonds as may be required. Each bidder must deposit with their bid, security in the amount and form subject to the conditions provided in the Instructions to Bidders. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least sixty (60) days. The Owner reserves the right to reject any or all bids and to waive informalities. Completion- 300 calendar days SCHEDULE I, ALTERNATE NO. 1 - WATER TRANSMISSION LINES UTILIZING HDPE (SDR-9) PIPE - all materials required to be furnished and perform all work required under this alternative, Water Transmission Lines Utilizing HDPE (SDR-9) Pipe SCHEDULE I, ALTERNATE NO. 2 - WATER TRANSMISSION LINES UTILIZING PVC (SDR-17) PIPE - furnish all materials required to be furnished and perform all work required under this alternative, Water Transmission Lines Utilizing PVC (SDR-17) Pipe SCHEDULE II - WATER STORAGE TANK: furnish all materials required to be furnished and perform all work required under this schedule, Water Storage Tank 12" HDPE (SDR-9) Pipe , 12" Gate Valves with boxes , 12" x 12" Tapping Sleeve and Valves with box, 6" x 6" Tapping Sleeve and Valves with box , Pressure Reducing Valve, Fire Hydrants with Auxiliary Gate Valves , Fire Hydrants with Auxiliary Gate Valves , Directional Bores without Encasement for Crossings of 12" Water Lines ,Gravel Surface, Cut and Replaced
Bid Results
Water / Sewer
$3,159,800.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2026
May 18, 2026
Multiple Locations, Bryant, AR
Related To This Project
Bryant, AR
Bid Date: Mar 16 2026
Bryant, AR
--
Bryant, AR
Bid Date: May 05 2026
Bryant, AR
Bid Date: May 14 2026
Bryant, AR
--
Bryant, AR
--
Bryant, AR
--
Bryant, AR
Bid Date: Feb 20 2026
Bryant, AR
--
Bryant, AR
--
Bryant, AR
Bid Date: Jan 05 2026
Bryant, AR
Bid Date: Jan 05 2026
Bryant, AR
Bid Date: Jan 05 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.