BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2026 at 8:00 PM

Updated May 20, 2026

Site work for an educational facility in Anaheim, California. Completed plans call for site work for a educational facility.

Ross Elementary School Exterior Fencing consisting of: 1. Replace existing 6' high ornamental fence and door with new 8' high ornamental fence and door, contractor-furnished and contractor-installed. 2. Replace existing 6' high ornamental fence, gate, and door with new 8' high chain link fence, gate, and door, contractor-furnished and contractor-installed. CONTRACT TIME: 47 consecutive calendar days. ESTIMATED CONSTRUCTION COST: $280,000. BONDING CAPACITY: Single bonding capacity must be 100% of the contract value. Question Deadline added as per Adda 2. Each bid must be submitted with bid security as described in the Instructions for Bidders. Bidder's security must be in an amount not less than 10% of the maximum amount of bid as a guarantee that the bidder will enter into the proposed Contract and provide all other required documents. Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required. All bonds must be issued by a California admitted surety. Bidders must meet requirements regarding Disabled Veteran Business Enterprise (DVBE) Programs. Any request for substitutions must be made at the time of Bid on the Substitution Request Form included in the Contract Documents. A valid and active Class B California contractor's license is required at the time of bid and throughout the duration of the Contract. Attendance at the pre-bid conference and site visit is mandatory for all bidders. The award of the Contract will be based on the lowest bid price on the base contract without consideration of the prices on additive or deductive items. The Project is a public work subject to all applicable Labor Code provisions, including registration with the California Department of Industrial Relations and payment of applicable Prevailing Wages. Substitution of securities in lieu of retention will be permitted as provided in the General Provisions. QA date - 3-6-2026 4:00 PM

Award

Educational

$242,487.00

Public - City

Site Work

12

7

6

8

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
670
Active Projects
361
Bidding Soon
4,530
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

June 8, 2026

Project location map

535 S Walnut St, Anaheim, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.