BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a civil project in Brainerd, Minnesota. Completed plans call for site work for a development; and water / sewer project.

**As of April 01, 2026, this project has not yet been awarded. The project is expected to be awarded on April 14, 2026.** The 2026 Landfill Construction Contract provides for the planned 2026 and 2027 construction projects at the Crow Wing County Landfill, Brainerd, Minnesota. Phase 1, 2026 construction consists of: partial closure of MSW Landfill Cells 3/4, construction of a rain cover on MSW Landfill Cells 3/4, relining of Leachate Pretreatment Ponds 1 and 2, and the installation of multiple vaults and associated piping throughout the Leachate Treatment area. Closure of Cells 3/4 generally consists of final intermediate grading (including waste regrading), buffer material placement, geomembrane liner placement, geocomposite drainage layer placement, rooting zone placement, topsoil placement and seeding, and finish site work. Rain cover construction of Cells 3/4 generally consists of final intermediate grading (including waste regrading), buffer material placement, and geomembrane liner placement. Liner replacement of Leachate Pretreatment Ponds 1 and 2 generally consists of rerouting raw leachate, removal of existing pipe penetrations and repair of existing liner, and relining the ponds with new geocomposite and geomembrane liner. Phase 2, 2027 construction consists of: construction of Municipal Solid Waste (MSW) Landfill Cell 6 and relining of Leachate Pretreatment Pond 3. Construction of Cell 6 generally consists of excavation and final grading, subgrade preparation, low permeability liner placement, geomembrane liner placement, granular drainage layer placement, straw layer placement, leachate collection system installation, gas lateral installation, electrical work, fencing, and finish site work. Liner replacement of Leachate Pretreatment Pond 3 (if alternative bid awarded) generally consists of removal of existing primary geomembrane liner, repair of existing geocomposite, and relining the ponds with new geomembrane liner. In addition, miscellaneous site improvements are included as identified in the Contract Documents. Dates for Substantial Completion for the different milestones are provided in the Agreement. Pre-qualification: Required QA date - 3-18-2026 Questions received less than 5 days prior to the date for opening of Bids may not be answered. Questions shall be directed to: Tonya L. Koller, PE Burns & McDonnell tkoller@burnsmcd.com (952) 656-3615

Award

Conservation and Development

$4,444,540.00

Public - County

Site Work

67

23

51

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
56
Bidding Soon
617
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2026

May 22, 2026

Project location map

15728 MN-210, Brainerd, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.