Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 25, 2026 at 7:00 PM
Updated February 26, 2026
Renovation of a military facility in Fort Riley, Kansas. Conceptual plans call for the renovation of a military facility.
Construction of a new 10-story Air Traffic Control Tower at Fort Riley, Kansas, including a control cab, offices, conference room, breakroom, electrical and mechanical rooms, radar simulator room, and associated utility and site work. Work includes concrete foundation systems, steel framing, masonry walls, metal roofing, fire detection and suppression systems, HVAC, electrical and telecommunication systems, backup electrical generation, elevator installation, utilities, sidewalks, access drive, grading, and site improvements designed in accordance with applicable DoD Unified Facilities Criteria for permanent construction, high-performance building requirements, and antiterrorism standards. The project also includes demolition and removal of the existing Air Traffic Control Tower and associated structures. Location: Fort Riley Building 500, Huebner Road Fort Riley, KS 66442 The Method of Contractor Selection has not been determined at this Time. The magnitude of this project is between $25,000,000.00 and $100,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Military
$100,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2027
To Be Determined, Fort Riley, KS
Related To This Project
Fort Riley, KS
Bid Date: Feb 05 2026
Fort Riley, KS
Bid Date: Jan 22 2026
Fort Riley, KS
Bid Date: Jan 29 2026
Fort Riley, KS
Bid Date: Jan 15 2026
Fort Riley, KS
Bid Date: Jan 15 2026
Fort Riley, KS
Bid Date: Dec 05 2025
Fort Riley, KS
Bid Date: Oct 31 2025
Fort Riley, KS
Bid Date: Sep 26 2025
Fort Riley, KS
Bid Date: Aug 14 2025
Fort Riley, KS
Bid Date: Jun 26 2025
Fort Riley, KS
Bid Date: Jul 01 2025
Fort Riley, KS
Bid Date: Jul 10 2025
Fort Riley, KS
Bid Date: Aug 20 2025
Fort Riley, KS
Bid Date: Aug 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
