BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2026 at 7:00 PM

Updated February 26, 2026

Renovation of a military facility in Fort Riley, Kansas. Conceptual plans call for the renovation of a military facility.

Construction of a new 10-story Air Traffic Control Tower at Fort Riley, Kansas, including a control cab, offices, conference room, breakroom, electrical and mechanical rooms, radar simulator room, and associated utility and site work. Work includes concrete foundation systems, steel framing, masonry walls, metal roofing, fire detection and suppression systems, HVAC, electrical and telecommunication systems, backup electrical generation, elevator installation, utilities, sidewalks, access drive, grading, and site improvements designed in accordance with applicable DoD Unified Facilities Criteria for permanent construction, high-performance building requirements, and antiterrorism standards. The project also includes demolition and removal of the existing Air Traffic Control Tower and associated structures. Location: Fort Riley Building 500, Huebner Road Fort Riley, KS 66442 The Method of Contractor Selection has not been determined at this Time. The magnitude of this project is between $25,000,000.00 and $100,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Military

$100,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
0
Bidding Soon
209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2027

Project location map

To Be Determined, Fort Riley, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.