Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 25, 2026 at 8:00 PM
Updated July 7, 2026
Renovation of a military facility in Fort Riley, Kansas. Working plans call for the renovation of a military facility.
The project consists of constructing a new Air Traffic Control Tower under a firm-fixed-price Design-Bid-Build contract. Work includes building a concrete foundation, steel framing, masonry walls, and a metal roof, along with installation of fire detection and suppression systems, HVAC, electrical and telecommunications systems, backup generation, and an elevator. The scope also covers all associated utility connections and site work, as well as the demolition of the existing Air Traffic Control Tower and related structures. The Method of Contractor Selection has not been determined at this Time. The estimated magnitude of this construction project is: Between $20,000,000.00 and $40,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Military
$40,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2027
To Be Determined, Fort Riley, KS
Related To This Project
Fort Riley, KS
Bid Date: Apr 06 2026
Fort Riley, KS
Bid Date: Jun 25 2026
Fort Riley, KS
Bid Date: Apr 23 2026
Fort Riley, KS
Bid Date: May 01 2026
Fort Riley, KS
Bid Date: May 29 2026
Fort Riley, KS
--
Fort Riley, KS
Bid Date: Feb 05 2026
Fort Riley, KS
Bid Date: Jan 22 2026
Fort Riley, KS
Bid Date: Jan 29 2026
Fort Riley, KS
Bid Date: Jan 15 2026
Fort Riley, KS
Bid Date: Jan 15 2026
Fort Riley, KS
Bid Date: Dec 05 2025
Fort Riley, KS
Bid Date: Oct 31 2025
Fort Riley, KS
Bid Date: Sep 26 2025
Fort Riley, KS
Bid Date: Aug 14 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
