BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 21, 2026

Site work and renovation of a water / sewer project in Belchertown, Massachusetts. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

The project proposes the replacement of two emergency generators for Department of Conservation and Recreation Quabbin Reservoir facilities located in Belchertown and Ware, Massachusetts. The work will involve the removal and installation of two new generator units complete with upgraded automatic transfer switches, remote monitoring systems, and fuel storage systems, along with electrical and site modifications as indicated on the drawings. The project is funded in part by the Federal Emergency Management Agency (FEMA). Total Construction Costs Are Estimated at: $ 442,420.00 , and the work must be completed within 270 calendar days of notice to proceed. Liquidated damages of $500 per day will be assessed if not completed on time. The contract includes requirements of 6% for minority-owned business enterprises, 10% for women-owned business enterprises, and 3% for Veteran-Owned Business Enterprises. Bidders must be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in Mechanical Systems, submit a bid deposit of 5%, and meet specific minority and women workforce utilization percentages. The Department reserves the right to waive informalities or reject any and all bids in the public interest. Site #1 - 485 Ware Road, Belchertown, Massachusetts 01007 County: Hampshire Site #2 - Quabbin Hill Road, Ware, Massachusetts 01082 County: Hampshire D. Project Description: The work includes the furnishing, delivery, pad preparation and install of replacement emergency generators with all related items to complete wo Any questions should be directed to DCR Project Manager, Scott Campbell scott.campbell@mass.gov by Close of Business Thursday, March 19, 2026. The work is to be accomplished within 270 calendar days of a notice to proceed. Any Ques- Tions Should Be Submitted by Email by Close of Business Thursday, May 14, 2026. Liquidated damages in the amount of $ 500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions).

GC Bidding

Water / Sewer

$442,420.00

Public - State/Provincial

Renovation, Site Work

16

16

2

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,116
Active Projects
669
Bidding Soon
6,375
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

July 13, 2026

Project location map

Multiple Locations, Belchertown, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.