BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 15, 2026

Demolition, site work and new construction of a water / sewer project in Houtzdale, Pennsylvania. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

**As of April 6th, 2026, this project has been awarded to Greenland Const. Inc., for $832,000.** The Houtzdale Municipal Authority is requesting bids for the construction of the Ginter Booster Pump Station Replacement. The work includes the construction of an above ground water booster pumping station and associated work, including the demolition of an existing below ground station. This is for Contract 26-01: General Construction.Project generally includes, but is not limited to, the construction of an above ground water boosterstation and the demolition (with component salvage) of an existing below ground water booster station and associated upgrades. Project Location: Fig Street off of S.R. 0153 (Ginter Morann Highway) in Gulich Township, Houtzdale, PA 16651. Bids must be submitted through the PennBID program, and bid security in the form of a Certified Check or Bid Bond must be included with the bid in an amount not less than 10%. All questions about the bidding documents should be submitted via PennBid. Bidders must comply with all state anti-bid-rigging regulations and submit an executed non-collusion affidavit with the bid. Compliance with environmental protection statutes and the Public Works Employment Verification Act is required, including submission of the Public Works Employment Verification Form as a precondition for contract award. The Pennsylvania Prevailing Wage Act applies. Bids shall be irrevocable for 60 days after opening unless extended by certain conditions. The Houtzdale Municipal Authority reserves the right to waive defects or reject any or all proposals as deemed in its best interest. Question Deadline 03/09/2026 at 4:00 PM ET Online Portal Completion- 210 days The estimated cost for this project is greater than Twenty-five Thousand Dollars ($25,000)

Award

Water / Sewer

$832,000.00

Public - City

Demolition, New Construction, Site Work

27

35

2

8

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
76
Bidding Soon
893
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2026

April 15, 2026

Project location map

Multiple Locations, Houtzdale, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.