BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2026 at 8:00 PM

Updated April 4, 2026

Renovation of a mixed-use development in Orlando, Florida. Completed plans call for the renovation of a educational facility.

As of March 30, 2026, project was awarded to Bishop Construction Group, awarded amount is $492,041.37 This project is a turnkey, phased refurbishment of nine (9) lounges located on Floors 2-9 of the Ronald Blocker Educational Leadership Center (RBELC). Additionally, this project shall be performed in Four Construction Phases, lounges on no more than 2 floors under construction in each Phase (see key highlights). Provide all labor, materials, equipment, supervision, and services necessary to deliver refreshed, safe, code-compliant, fully functioning lounges. Key project highlights include, but are not limited to: o Installation of all new finishes, fixtures, casework, electrical modifications, lighting, plumbing connections, accessories, and any other work shown or reasonably implied by the design documents. o Coordination of all phasing, temporary protections, logistics, and safety measures to ensure adjacent floors remain operational and staff access to at least one fully functioning lounge within one floor of work area at all times. o Compliance with all OCPS requirements, permitting, inspections, and turnover documentation. o Select demolition and removal of existing doors, millwork, sinks, fixtures, countertops, hot water heaters, appliances, cove base, flooring, flooring glues, and wall coverings other than paint will be performed by others. QUESTION DEADLINE: All questions must be posted on VendorLink by no later than 2:00 PM, Friday, February 20, 2026.

Award

Educational

$492,041.00

Public - County

Renovation

47

16

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

April 3, 2026

Project location map

445 W Amelia St, Orlando, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.