BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Northampton, Massachusetts. Completed plans call for site work for a water / sewer project.

This is an Industry Day Posting for the 631-19-002 Upgrade Steam Distribution System Phase 2. Please read the Special Notice and RSVP accordingly. Work includes the removal and upgrade of steam distribution system in Buildings 1, 4, 5, 8, 9, 15, 16. Work will be completed in multiple phases within each building as coordinated between the awarded contractor and COR. Work includes the necessary removal of existing structures, new construction, and certain other items in order to upgrade the steam distribution system as indicated in the Specifications and Drawings. Work also includes power distribution to new system components where required and upgrades or connections to the existing campus BMS to control new installations where required and the removal of existing hazardous materials including asbestos and lead paint. The scope of work also includes the construction of fire rated containment and ICRA barriers at all areas of demolition, asbestos abatement, lead removal, new construction, etc. Project No. W912F-12-D-0007, 36C24126Q0173Solicitation Construction services to upgrade the steam distribution system at the VA Central Western Massachusetts Healthcare System Edward P. Boland Campus. Work includes executing Phase 2 of Project 631-19-002, involving improvements to the existing steam distribution infrastructure in accordance with project specifications and construction documents. The contractor shall provide all necessary labor, materials, equipment, and supervision to perform the required upgrades to ensure reliable and compliant steam distribution throughout the campus. Location: VA Central Western Massachusetts Healthcare System - Edward P. Boland Campus 421 North Main Street, Leeds, MA 01053 Request for Information (RFI) Due Date/Time: 03/17/2026 at 1:00 PM ET. Magnitude of Construction: Between $10,000,000 and $20,000,000. Offer Acceptance Period: Offeror providing less than 120 calendar days for Government acceptance will not be considered and will be rejected. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$20,000,000.00

Public - Federal

Site Work

137

41

116

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
759
Active Projects
366
Bidding Soon
3,445
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2026

July 14, 2026

Project location map

421 N Main St, Northampton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.