BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Renovation of an educational facility in Carson, California. Completed plans call for the renovation of a educational facility.

Question Deadline 03/10/2026 Each transmitted request shall contain the name of the person and/or firm filing the request, address, telephone and fax number, Specifications and/or Drawing number. Bidder is responsible for the legibility of hand written requests. Pre-bid clarification requests shall be filed a minimum of seven (7) days prior to bid opening. The CONTRACTOR shall perform, within the time stipulated in the Contract Documents, all of which are incorporated herein and shall provide all labor, materials, equipment, tools, utility services, transportation and everything else necessary to complete in a workmanlike manner, and in exact compliance with the terms of the Contract Documents, all of the Work required in connection with the following titled Project Owner Is Committed To Sustainable Or "high Performance" Design And Construction In All Of Its Schools Because High Performance Schools Enhance Student And Teacher Performance, Reduce Operating Costs, And Protect The Environment. To Implement This Commitment, The Owner Endorses The High Performance School Strategies Defined In The Collaborative For High Performance School (chps) Best Practices Manuals (available At Www.chps.net), And Requires That All Qualified Projects Achieve, At A Minimum, A "chps School" Rating. The Owner Shall Be Responsible For Monitoring Compliance With The Chps Criteria Necessary To Achieve This Objective. Project No. 2024-108-00, 1110005287 Sealed bids for a lump sum contract are invited for the revised HVAC replacement at Andrew Carnegie Middle School for the Los Angeles Unified School District. The owner is committed to sustainable or high performance design and construction standards, requiring the project to achieve, at a minimum, a "CHPS School" rating as defined in the Collaborative for High Performance School Best Practices Manuals. The owner will monitor compliance with these criteria. The Contract Time is 180 days.

Post-Bid

Educational

$225,000.00

Public - County

Renovation

9

41

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
3
Bidding Soon
2,120
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

April 16, 2026

Project location map

21820 Bonita St, Carson, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.