Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 20, 2026 at 8:00 PM
Updated March 21, 2026
Renovation of an educational facility in Carson, California. Completed plans call for the renovation of a educational facility.
Question Deadline 03/10/2026 Each transmitted request shall contain the name of the person and/or firm filing the request, address, telephone and fax number, Specifications and/or Drawing number. Bidder is responsible for the legibility of hand written requests. Pre-bid clarification requests shall be filed a minimum of seven (7) days prior to bid opening. The CONTRACTOR shall perform, within the time stipulated in the Contract Documents, all of which are incorporated herein and shall provide all labor, materials, equipment, tools, utility services, transportation and everything else necessary to complete in a workmanlike manner, and in exact compliance with the terms of the Contract Documents, all of the Work required in connection with the following titled Project Owner Is Committed To Sustainable Or "high Performance" Design And Construction In All Of Its Schools Because High Performance Schools Enhance Student And Teacher Performance, Reduce Operating Costs, And Protect The Environment. To Implement This Commitment, The Owner Endorses The High Performance School Strategies Defined In The Collaborative For High Performance School (chps) Best Practices Manuals (available At Www.chps.net), And Requires That All Qualified Projects Achieve, At A Minimum, A "chps School" Rating. The Owner Shall Be Responsible For Monitoring Compliance With The Chps Criteria Necessary To Achieve This Objective. Project No. 2024-108-00, 1110005287 Sealed bids for a lump sum contract are invited for the revised HVAC replacement at Andrew Carnegie Middle School for the Los Angeles Unified School District. The owner is committed to sustainable or high performance design and construction standards, requiring the project to achieve, at a minimum, a "CHPS School" rating as defined in the Collaborative for High Performance School Best Practices Manuals. The owner will monitor compliance with these criteria. The Contract Time is 180 days.
Post-Bid
Educational
$225,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2026
April 16, 2026
21820 Bonita St, Carson, CA
Related To This Project
Carson, CA
Bid Date: Mar 12 2026
Carson, CA
Bid Date: Apr 02 2026
Carson, CA
Bid Date: Mar 12 2026
Carson, CA
Bid Date: Feb 26 2026
Carson, CA
Bid Date: Mar 19 2026
Carson, CA
--
Carson, CA
Bid Date: Jan 22 2026
Carson, CA
--
Carson, CA
Bid Date: Dec 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
