BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2026 at 8:00 PM

Updated March 25, 2026

Renovation of an educational facility in Abbotsford, British Columbia. Completed plans call for the renovation of a educational facility.

1. Provide new, complete, operational and tested mechanical hydronic heating system and ventilation system as described herein, indicated on the drawings and in full conformance with applicable codes, standards and ordinances. 2. Provide all labour, materials and products as specified, and as required to accomplish this work. 3. Existing DDC panels will be upgraded to suit the heating and ventilation upgrade. 4. Mechanical Contractor shall coordinate and cooperate with the DDC control Contractor for the locations of the required pressure, and temperature sensors as well as the operation and commissioning of the upgraded hydronic system. 5. The mechanical contractor shall act as the Prime Contractor for this project, responsible for the coordination of all trades required to carry out the work as described herein. 6. The scope of the upgrade work for this project generally includes the following: 1. Demolition and replacement of existing heating and ventilation equipment for Phase 2 (Level 2 of the Building and Gym Air Handling Unit). 2. Unit Ventilators, ductwork, grilles, seismic support and restraints. 3. Air cooled heat pump units that serve the Unit Ventilators. 4. Refrigerant piping and condensate drainage for heat pumps. 5. Replacement of all the heating water piping and pipe insulation. 6. Connection of UV to the heating water provision from Phase 1. 7. New roof mounted Gymnasium Air Handling Unit, ductwork and grilles 8. New wall mounted cooling cassette and associated heat pump units . 9. New force flow heaters 10. Fire Stopping 11. Direct digital controls. 12. Water and air balancing systems. 13. Commissioning of the systems operation and controls. 14. Re & Re of existing bulkheads 15. Electrical work associated with upgrade, refer to Electrical 7. Demolition and builder's work will include the following: .1 Other demolition, painting, remediation, etc., as described in the specifications and on the drawings, to accommodate the Work. .2 Non-structural seismic protections .3 Demolition of existing millwork, shelving and supply & installation of new millwork sections as required to infill removed. 8. Electrical works will require the following: .1 Electrical power supplies to mechanical equipment. .2 Removal and replacement of miscellaneous electrical devices, including some equipment.

Post-Bid

Educational

$100,000.00

Public - State/Provincial

Renovation

10

19

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
2
Bidding Soon
1,446
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

May 1, 2026

Project location map

36321 Vye Rd, Abbotsford, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.