BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2026 at 8:00 PM

Updated March 11, 2026

Site work and paving for a road / highway in Forest Park, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

For proviso east and proviso west sealed coating and crack repair. Completion - JUNE15,2026 AND JULY 30, 2026 Scope of Work: 1. Seal coat approximately 131,960 SF of existing asphalt using coal tar emulsion sealant, two (2) coats 2. Provide crack filling at joints as necessary (approximately 50% of area) 3. Stripe pavement with one (1) coat of pavement marking paint per plans PROVISO WEST - NORTH STUDENT LOT 4. Seal coat approximately 113,829 SF of existing asphalt using coal tar emulsion sealant, two (2) coats 5. Provide crack filling at joints as necessary (approximately 10% of area) 6. Stripe pavement with one (1) coat of pavement marking paint per plans PROVISO WEST - D LOT 7. Seal coat approximately 51,298 SF of existing asphalt using coal tar emulsion sealant, two (2) coats 8. Provide crack filling at joints as necessary (approximately 10% of area) 9. Stripe pavement with one (1) coat of pavement marking paint per existing layout PROVISO WEST - TEACHER'S LOT 10. Seal coat approximately 38,283 SF of existing asphalt using coal tar emulsion sealant, two (2) coats 11. Provide crack filling at joints as necessary (approximately 10% of area) 12. Stripe pavement with one (1) coat of pavement marking paint per existing layout PROVISO WEST - DROP-OFF LANE / CIRCLE DRIVE (WOLF ROAD) 13. Seal coat approximately 18,300 SF of existing asphalt using coal tar emulsion sealant, two (2) coats 14. Provide crack filling at joints as necessary (approximately 10% of area) 15. Stripe pavement with one (1) coat of pavement marking paint per plans 16. Paint two (2) bollards 17. Paint approximately 1,000 LF of curb top PROVISO EAST CAMPUS 18. Seal coat approximately 236,215 SF of existing asphalt using coal tar emulsion sealant, two (2) coats 19. Provide crack filling at joints as necessary (approximately 10% of area) 20. Stripe pavement with one (1) coat of pavement marking paint per existing layout 21. Circle Drive cut and patch asphalt 22. Madison Lot (south of the school) included f you have questions, please feel free to contact me dcourts@pths209.org

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
3
Bidding Soon
2,111
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2026

June 15, 2026

Project location map

Multiple Locations, Forest Park, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.