BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 1, 2026 at 8:00 PM

Updated May 21, 2026

Site work, paving and new construction of a mixed-use development in Long Beach, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; for the construction of a 177,658-square-foot educational facility; educational facility; parking garage; and parking garage.

This is the final increment (2B) of the comprehensive modernization project at Washington Middle School in Long Beach. Project is the construction of a new middle school with approximately 177,658 SF of new buildings, plus a parking structure with a rooftop field: • Building 1000: 118,531 SF — three-story classroom building • Building 2000: parking structure with rooftop field • Building 3000: 42,687 SF — gymnasium/classroom building • Building 4000: 16,440 SF — auditorium Scope of work in this phase of the project includes, but not limited to: Survey, Final Clean, Site Demolition, Concrete, Reinforcing, Sealed Concrete, Shotcrete, Post-Tensioned Concrete, Masonry, Masonry Veneer, Rough Carpentry, Casework, Waterproofing, Traffic Coatings, Insulation, Roofing, GFRC Panels, Sheet Metal, Fireproofing, Joint Sealants, Doors, Frames, & Hardware, Coiling Doors, Skylights, Glazing, Gypsum Board, Plaster, Tiling, Acoustical Ceilings, Flooring, Wood Flooring, Wall Coverings, Acoustic Treatment, Painting, Visual Display, Signage, Toilet Accessories, Operable Partitions, FRP, Fire Extinguishers, Lockers, Storage Assemblies, Flagpoles, Foodservice Equipment, Audio-Visual Equipment, Theater and Stage Equipment, Athletic Equipment, Play Field Equipment, Scoreboards, Window Treatments, Lab Casework, Fixed Audience Seating, Telescoping Stands, Shade Structures, Wheelchair Lifts, Fire Suppression, Plumbing, HVAC, Electrical, Photovoltaic, Communications, Access Control, Security, Fire Alarm, Earthwork, Erosion Control, Asphalt Paving, Site Concrete, Striping, Artificial Turf, Fencing, Site Furnishings, Landscape, and Site Utilities. This project requires prequalification. Long Beach Unified School District requires all general contractors and all mechanical, electrical and plumbers (MEP) subcontractors utilizing any of the following licenses be prequalified with the District: General Contractors (A and B) and Subcontractors (C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46) Long Beach Unified uses QualityBidders (https://www.qualitybidders.com/) to manage prequalification.

Post-Bid

Educational

$18,500,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
665
Active Projects
360
Bidding Soon
4,560
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

May 11, 2026

Project location map

1450 Cedar Ave, Long Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.