BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 12, 2026 at 8:00 PM

Updated March 13, 2026

Site work for a water / sewer project in Genoa, Ohio. Completed plans call for site work for a water / sewer project.

Sealed bids will be received for the 500K Gallon Water Tank Improvements project. Bids must be in accordance with the provided drawings and specifications, and submitted on forms available from Verdantas, LLC. The project is funded by the Water Supply Revolving Loan Account Program and the Ohio Water Development Authority. The contractor must meet Disadvantaged Business Enterprise participation goals and comply with the EPA policy on small business participation in rural areas. The Prime Contractor and subcontractors should use Ohio products, materials, services, and labor as much as practicable, and domestic steel requirements apply. Bid documents are available for purchase, and it is the responsibility of the bidder to check for addenda. OPINION OF PROBABLE CONSTRUCTION COST: $868,500.00 SUBSTANTIAL COMPLETION: APRIL 30, 2027 FINAL COMPLETION: MAY 21, 2027 The current negotiated goal for construction related activitiesis 5.4% (the total goal is based on 3.1% of MBEs and 2.3% of WBEs participation). The structure is a 500,000-gallon fluted column elevated water storage tank with a diameter of 49.5 ft. and a low-water level of 90 ft. 10.25 in. located at 9 West State Route 163 in Genoa, Ohio. The work includes: Exterior. Abrasive blast clean to a SSPC-SP6 commercial standard within containment. Apply a four (4) coat zinc epoxy urethane system. Wet Interior: Abrasive blast clean to a SSPC-SP10 near-white metal standard. Apply a three (3) coat zinc epoxy system. Dry Interior: Abrasive blast clean the entire top ofthe top platform and spot coating failures throughout to a SSPC-SP6 commercial standard. Apply a two (2) coat epoxy system to the prepared surfaces. PitPiping: Abrasive blast clean to a SSPC-SP6 commercial standard. Apply a two (2) coat epoxy system. Foundation: Abrasive blast clean and apply a two (2) coat epoxy system. Repairs: Install cathodic clips and pressure fitting. Replace the bowl manway gasket. Install a gasket on the wet interior roofhatches. Install handholds at the roofhatches located inside the new roofhandrail. Replace the mud valve. Overflow discharge modification. Install a fall prevention device on the column ladders. Install a wet interior ladder. Replace the interior roof vent screen. Install a roofhandrail with a painter's railing. Replace the dry interior and aviation light bulbs. 5) Replace the sample tap on the fill/draw pipe. All questions during bidding should be addressed to Ryan Schuster, PE, at Verdantas, LLC, 3875 Embassy Parkway, Suite 200, Akron OH 44333, at (330)-2473738.

Bid Results

Water / Sewer

$581,800.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
352
Active Projects
190
Bidding Soon
2,145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

April 9, 2026

Project location map

To be determined, Genoa, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.