Happy Independence Day

Life, liberty, and the pursuit of better bids.

Buy Now →
BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Renovation of a clubhouse / community center in Crosby, Texas. Completed plans call for the renovation of a 3,000-square-foot clubhouse / community center.

CSP - Crosby Community Center HVAC Controls Upgrades for the Office of the County Engineer (Estimated Budget $1,636,424) Vendors shall assemble at the front door reception area. A site visit for vendors to inspect the work area will immediately follow the pre-proposal conference. The pre-proposal conference and site visit will not be rescheduled due to tardiness or any other issue(s) that may arise; no exceptions. The project includes the replacement of six (6) air handling units (AHUs), including associated fresh air systems and downstream ductwork for each unit. New electrical service shall be provided to all AHUs. The system shall be redesigned and rezoned, with consideration given to reducing the number of AHUs and incorporating variable frequency drives (VFDs) to shorten the chilled water pump circuit and improve system efficiency. For energy efficiency and maintenance purposes, consideration shall be given to incorporating gas heat, including fresh air supply to the mechanical room and high-pressure ductwork. The design shall incorporate fan-powered boxes with heating coils and carbon dioxide (CO2) sensors in each room to enhance occupant comfort and ventilation control. The selected firm shall coordinate with Automated Logic Controls to ensure compliance with design specifications and installation requirements. The rates quoted on the BidTable must be all-inclusive. "All-inclusive" shall be construed as costs incorporating all charges for labor, material, equipment and any other cost incurred. No separate line item rates or charges will be accepted.

Sub-Bidding

Clubhouse / Community Centers

$1,636,424.00

Public - County

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
432
Active Projects
61
Bidding Soon
3,277
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2026

September 7, 2026

Project location map

409 Hare Rd, Crosby, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.