Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 18, 2026 at 8:00 PM
Updated July 26, 2026
Renovation of a clubhouse / community center in Crosby, Texas. Completed plans call for the renovation of a 3,000-square-foot clubhouse / community center.
Project No: 422003.08 CSP - Crosby Community Center HVAC Controls Upgrades for the Office of the County Engineer (Estimated Budget $1,636,424) Vendors shall assemble at the front door reception area. A site visit for vendors to inspect the work area will immediately follow the pre-proposal conference. The pre-proposal conference and site visit will not be rescheduled due to tardiness or any other issue(s) that may arise; no exceptions. The project includes the replacement of six (6) air handling units (AHUs), including associated fresh air systems and downstream ductwork for each unit. New electrical service shall be provided to all AHUs. The system shall be redesigned and rezoned, with consideration given to reducing the number of AHUs and incorporating variable frequency drives (VFDs) to shorten the chilled water pump circuit and improve system efficiency. For energy efficiency and maintenance purposes, consideration shall be given to incorporating gas heat, including fresh air supply to the mechanical room and high-pressure ductwork. The design shall incorporate fan-powered boxes with heating coils and carbon dioxide (CO2) sensors in each room to enhance occupant comfort and ventilation control. The selected firm shall coordinate with Automated Logic Controls to ensure compliance with design specifications and installation requirements. The rates quoted on the BidTable must be all-inclusive. "All-inclusive" shall be construed as costs incorporating all charges for labor, material, equipment and any other cost incurred. No separate line item rates or charges will be accepted. Questions Due Date: Jun 26th 2026, 12:00 PM CDT
Sub-Bidding
Clubhouse / Community Centers
$1,636,424.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 27, 2026
September 28, 2026
409 Hare Rd, Crosby, TX
Related To This Project
Crosby, TX
Bid Date: Apr 13 2026
Crosby, TX
Bid Date: May 28 2026
Crosby, TX
Bid Date: May 06 2026
Crosby, TX
Bid Date: Apr 30 2026
Crosby, TX
Bid Date: Apr 30 2026
Crosby, TX
Bid Date: Jun 09 2026
Crosby, TX
Bid Date: Jun 19 2026
Crosby, TX
Bid Date: Jul 02 2026
Crosby, TX
Bid Date: Jan 23 2026
Crosby, TX
Bid Date: Jan 14 2026
Crosby, TX
Bid Date: Feb 02 2026
Crosby, TX
Bid Date: Feb 02 2026
Crosby, TX
Bid Date: Mar 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
