Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 26, 2026 at 7:00 PM
Updated April 1, 2026
Site work for a civil project in Mission, Oregon. Completed plans call for site work for a water / sewer project; bridge / tunnel; and bridge / tunnel.
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR), Department of Natural Resources Fisheries Program, is requesting proposals for the construction of the Coonskin Creek Fish Passage Project, located on Cayuse Road (County Road 900) approximately 7.8 miles east of Mission, Oregon, Umatilla County. The project involves the removal of two fish passage barriers (a culvert under Cayuse Road and an abandoned 2 ft diameter water pipeline), and the re-alignment of the Coonskin Creek channel downstream of Cayuse Road. Construction will include earthwork, road excavation, channel grading, removal and capping of the pipeline, installation of a 3-sided box culvert, road fill, paving, replanting, water management/implementation of Best Management Practices (BMPs), and other specified project elements and features detailed in the project drawings and specifications. The contractor is responsible for developing a detailed construction schedule and sequencing plan, which must coordinate closely with CTUIR staff regarding road closure timing. All in-channel work must be completed during the CTUIR in-water work window (June 1 to September 30). The contractor and staff may be required to attend pre-construction cultural resources training and adhere to the inadvertent discovery plan for cultural materials. Sensitive areas requiring avoidance will be flagged and staked to ensure protection of resources. Staging areas must be entirely above the ordinary high water elevation; road closure must avoid wildfire season and Pendleton School District sessions, and the duration of road closure must be minimized. Project Magnitude Between $650,000 - $900,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. QA date - 3-13-2026
Post-Bid
Bridges / Tunnels
$900,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
