BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Hanapepe, Hawaii. Completed plans call for site work for a water / sewer project.

Job No. 26-01, Slip Line Hanapepe 16-inch HDPE Pipeline, Kauai, Hawaii SCOPE OF WORK: The work to be performed under this contract shall consist of installation of the 12-inch Primus Liner system inside a 16-inch HDPE potable mainline that is a transmission line from the Hanapepe Water System to the Eleele Water System.. The connection point at the bottom Job No. 26-01 SLIP LINE HANAPEPE 16-INCH HDPE PIPELINE 2 will be where the 12-inch main exits the Eleele Booster Pump building. The 12-inch spool piece will be shortened to make room for a 12-inch mechanical flange adapter to connect the 12-inch slip line. The connection point at the top will be between the highway and the fence line for the Eleele Steel Tanks. A pit will be dug to access the 12-inch main where a mechanical flange adapter will be installed to connect the 12-inch slip line. The slip line shall be pulled through several bends along the total length of 1,000 feet of pipe run. The bottom section of 12-inch pipe to the Booster Pump building has three (3) 45 elbows, two (2) 22-1/2 elbows, and one (1) 90 elbow. The top section of pipe to the Tank site has one (1) 16-inch 90 elbow. There is no need for a bypass line for this project. The Department will be responsible for performing the excavation pit work for the top connection, providing all civil design work for the project, and performing the chlorination of the new liner. Contractor is only responsible for providing and installing the liner and fittings for connection. Installation access points are within Department of Water and State Highways easements. Total length of pull is 1,000 feet, as indicated in the contract drawings and specifications. CONTRACTORS LICENSE: All prospective Bidders must be currently licensed by the State of Hawai'i, Department of Commerce and Consumer Affairs, Division of Professional and Vocational Licensing. Deadline: Receipt of Questions/Comments/Material Substitutions May 11, 2026 Questions and requests for clarification must be submitted in writing via e-mail

GC Bidding

Water / Sewer

$1,000,000.00

Public - County

Site Work

16

5

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
8
Bidding Soon
51
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2026

August 3, 2026

Project location map

To be determined, Hanapepe, HI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.