Published May 19, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Hanapepe, Hawaii. Completed plans call for site work for a water / sewer project.
Job No. 26-01, Slip Line Hanapepe 16-inch HDPE Pipeline, Kauai, Hawaii SCOPE OF WORK: The work to be performed under this contract shall consist of installation of the 12-inch Primus Liner system inside a 16-inch HDPE potable mainline that is a transmission line from the Hanapepe Water System to the Eleele Water System.. The connection point at the bottom Job No. 26-01 SLIP LINE HANAPEPE 16-INCH HDPE PIPELINE 2 will be where the 12-inch main exits the Eleele Booster Pump building. The 12-inch spool piece will be shortened to make room for a 12-inch mechanical flange adapter to connect the 12-inch slip line. The connection point at the top will be between the highway and the fence line for the Eleele Steel Tanks. A pit will be dug to access the 12-inch main where a mechanical flange adapter will be installed to connect the 12-inch slip line. The slip line shall be pulled through several bends along the total length of 1,000 feet of pipe run. The bottom section of 12-inch pipe to the Booster Pump building has three (3) 45 elbows, two (2) 22-1/2 elbows, and one (1) 90 elbow. The top section of pipe to the Tank site has one (1) 16-inch 90 elbow. There is no need for a bypass line for this project. The Department will be responsible for performing the excavation pit work for the top connection, providing all civil design work for the project, and performing the chlorination of the new liner. Contractor is only responsible for providing and installing the liner and fittings for connection. Installation access points are within Department of Water and State Highways easements. Total length of pull is 1,000 feet, as indicated in the contract drawings and specifications. CONTRACTORS LICENSE: All prospective Bidders must be currently licensed by the State of Hawai'i, Department of Commerce and Consumer Affairs, Division of Professional and Vocational Licensing. Deadline: Receipt of Questions/Comments/Material Substitutions May 11, 2026 Questions and requests for clarification must be submitted in writing via e-mail
GC Bidding
Water / Sewer
$1,000,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 27, 2026
August 3, 2026
To be determined, Hanapepe, HI
Related To This Project
Hanapepe, HI
Bid Date: Jun 05 2026
Hanapepe, HI
Bid Date: May 14 2026
Hanapepe, HI
Bid Date: Jan 16 2026
Hanapepe, HI
Bid Date: Nov 07 2025
Hanapepe, HI
--
Hanapepe, HI
Bid Date: Sep 11 2025
Hanapepe, HI
Bid Date: Sep 02 2025
Hanapepe, HI
Bid Date: Jul 17 2025
Hanapepe, HI
Bid Date: May 13 2025
Hanapepe, HI
Bid Date: Jun 17 2025
Hanapepe, HI
--
Hanapepe, HI
Bid Date: Mar 27 2025
Hanapepe, HI
Bid Date: Feb 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.