Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 23, 2026 at 8:00 PM
Updated July 29, 2026
Renovation of an educational facility in Fresno, California. Completed plans call for the renovation of a educational facility.
Description of Work: The Work Includes Fire Alarm and Telephone System Replacement and Associated Work, Removal and Replacement of Site Fencing, and Construction of a New Concrete Trike Path. 6. Basis for Bids: Bids Shall Be on a Lump Sum Basis. Time of Completion: The Work Shall Be Completed Within 90 Calendar Days From the Date of the Owner's Notice to Proceed. Bid Security: Submit Bid Security With Proposal, Made Payable to Owner, in Amount of 10% of the Bid, in the Form of Certified Check, Bid Bond, Cashier's Check or Cash. Bid Security Will Be Retained Until Agreement is Signed and Required Bonds Furnished. If Any Bidder Refuses to Sign the Agreement Form Within 7 Days After Award, the Owner Will Retain His Bid Security as Liquidated Damages. To Enable Compliance With California Code of Civil Procedure Section 995.311, Each Contractor Shall Provide, Prior to Contract Award, a Print-out of Information From the Department of Insurance Website The Owner Reserves the Right to Reject Any and All Bids and/or Waive Any Informality in Any Bid Received and/or Determine in Its Discretion the Responsibility of Any Bidder, and Which Bid is Most Advantageous to the Owner. Unless Otherwise Required by Law, No Bidder May Withdraw His Bid for a Period of 60 Days After the Date Set for the Opening Thereof, or Any Authorized Postponement Thereof. The Owner Reserves the Right to Take More Than 60 Days to Make a Decision Regarding the Rejection of Bids or the Award of the Contract. Prevailing Wages: The Project is a Public Work and Under California Labor Code Section 1770 Et Seq., the Director of the California Department of Industrial Relations (""Dir"") Has Determined the General Prevailing Rate of Per Diem Wages and the General Prevailing Rate for Holiday and Overtime Work in the Locality in Which the Work is to Be Performed, for Each Craft, Classification or Type of Worker Needed to Execute This Contract. Copies of the Rates Are on File at the Owner's Principal Office. It Shall Be Mandatory Upon the Contractor and on Any Subcontractor to Pay Not Less Than the Said Specified Rates to All Workers Employed in the Execution of This Agreement. Dir Registration: The Owner Will Not Accept Any Bid or Enter Into Any Contract Without Proof of the Bidder's Current Registration to Perform Public Work Under Labor Code Section 1725.5. Bidders Shall Not Accept Any Subbid or Enter Into Any Subcontract Without Proof of the Subcontractor's Current Registration to Perform Public Work Under Labor Code Section 1725.5. Labor Compliance: Contractor and All Subcontractors Shall Comply With Labor Code Section 1776. In Accordance With Labor Code Section 1771.4(a)(1), the Project is Subject to Compliance Monitoring and Enforcement by the Dir. The Contractor and Each Subcontractor Shall Furnish a Certified Copy of All Payroll Records Directly to the Labor Commissioner on a Monthly Basis, Unless Directed by the Owner to Furnish Such Records More Often, and in the Format Prescribed by the Labor Commissioner. Required Certifications: Bids Must Be Accompanied by Fully Executed Forms as Described in Section 00 2110 Instructions to Bidders. If any person contemplating submitting a bid for the construction of the Work is in doubt as to the true meaning of any part of the Contract Documents or finds discrepancies in or omissions from any part of the Contract Documents, he may submit to the Architect a written request for an interpretation thereof not later than 7 days before bids will be opened
Award
Educational
$843,455.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
July 31, 2026
3530 S Cherry Ave, Fresno, CA
Related To This Project
Fresno, CA
Bid Date: Mar 12 2026
Fresno, CA
Bid Date: Mar 26 2026
Fresno, CA
Bid Date: Mar 10 2026
Fresno, CA
Bid Date: Feb 26 2026
Fresno, CA
Bid Date: Jun 29 2026
Fresno, CA
Bid Date: Mar 31 2026
Fresno, CA
Bid Date: Apr 14 2026
Fresno, CA
Bid Date: Mar 31 2026
Fresno, CA
Bid Date: Apr 16 2026
Fresno, CA
Bid Date: Mar 31 2026
Fresno, CA
Bid Date: Mar 04 2026
Fresno, CA
Bid Date: Mar 24 2026
Fresno, CA
Bid Date: Mar 10 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
