BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2026 at 7:00 PM

Updated February 27, 2026

Site work and paving for a road / highway in Plymouth, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

MnDOT requests letters of interest to prepare final road plans, specifications, cost estimates, a stormwater management plan, and all related documents and agreements for: Trunk Highway (TH) 280: From Wabash Avenue (Ave.) in St. Paul to just north of Broadway Street (St.). Hennepin Avenue: (Hennepin Reconstruction) From the 33rd Ave. intersection to 300 feet west of Industrial Boulevard (Blvd.), in coordination with Hennepin County. The final plan will also incorporate five bridge preservation plans developed by the MnDOT Bridge Office for bridge numbers 9471, 9472, 62033, 62034, and 62843 and accommodating Minnesota Commercial Railway Crossing plans at Hennepin Ave. and Industrial Blvd. and a drainage repair on Energy Park Drive. The goal of this project is to provide a MnDOT biddable final plan and specifications for the TH 280 Project and reconstruction of Hennepin Ave. (Hennepin Ave. Reconstruction) which includes, but is not limited to, the following: Roadway design, curb ramps, sidewalks and trails in compliance with the Americans with Disabilities Act (ADA) for sidewalks and trails, Drainage design including stormwater management planning and design, Design of guardrail and barrier systems, Traffic signal removal at the intersection of TH 280 and Broadway St. NE., Traffic signal removal and replacement at Hennepin Ave. and Industrial Blvd. which includes signal interconnect for Minnesota Commercial Railway crossing, Traffic Management Plan (communication planning not included), Traffic Control Plans and Preliminary Staging, Pedestrian crossing design, Geotechnical design (geotechnical exploration not included), Traffic control planning and staging, Signage and roadway lighting design, and utility notification and coordination Prospective, pre-qualified responders who have any questions regarding this request for letters of interest must submit questions, by e-mail, to the Contract Administrator: Pam O'Brien pam.obrien@state.mn.us Questions regarding this announcement must be received, via e-mail, by the Contact Administrator identified above no later than 11:00AM Central Time on 3/3/2026. MnDOT anticipates posting answers to all questions received by 3:00PM Central Time on 3/5/2026 MNDOT: RFQ Engineering - TH 280 Broadway Street and Hennepin Avenue

Conceptual

Roads / Highways

$4,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
1
Bidding Soon
928
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2027

Project location map

Multiple Locations, Plymouth, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.