Published February 25, 2026 at 7:00 PM

Updated February 26, 2026

Site work for a civil project in Sugar Land, Texas. Conceptual plans call for site work for a bridge / tunnel; and road / highway.

TxDOT will begin a new phase of construction in March 2026 to address erosion near the northbound US-59/I-69 Brazos River Bridge in Sugar Land. The work includes traffic shifts on the northbound main lanes, closure of access to the northbound frontage road over the river, and adjustments to detour routes affecting nearby neighborhoods and parks. The frontage road portion is expected to complete by March 2027, with total construction projected to finish in December 2027

Conceptual

Roads / Highways

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
144
Bidding Soon
4,204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2026

Project location map

US-59, Sugar Land, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed