BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2026 at 7:00 PM

Updated March 18, 2026

Renovation of a mixed-use development in Sherwood Park, Alberta. Completed plans call for the renovation of a educational facility.

Work of this Contract comprises the following: The abatement of the asbestos containing texture will be the responsibility of the Contractor. The Owner has allowed for and will pay for a total of ten (10) business days (excluding weekends) of air monitoring for the hazardous material abatement. The successful Contractor will be required to coordinate with the Owner’s air monitoring company for dates and times. The Contractor will be required to pay for any air monitoring required beyond ten (10) days, if required. Sequence the work accordingly to ensure the Courtyard/play areas are the priority for completion, the front of the building will be the final location to be completed. Complete the wall repairs as outlined including the removal and installation of new caulking at all exterior locations, removal and replacing of the brick, repairs to the corbel, and the supply and installation of new metal cladding/flashing. Painting of the repaired brick along the west face of the building. Contractor is required to provide and maintain a perimeter fence for the duration of the work. Appropriate signage must be provided. The adjacent playgrounds are not within the Elk Island Public School’s jurisdiction. The playgrounds will remain accessible to the public for the duration of the project. The Contractor is to ensure the safety of the public and school occupants with appropriate barricades and signage while the work is being performed. Question Deadline 03/10/2026 at 4:00 PM

Post-Bid

Educational

$100,000.00

Public - State/Provincial

Renovation

25

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
1
Bidding Soon
305
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

June 25, 2026

Project location map

52029 Range Rd 224, Sherwood Park, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.