BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2026 at 7:00 PM

Updated February 27, 2026

This is a service / maintenance or supply contract in Shippensburg, Pennsylvania. Contact the soliciting agency for additional information.

Initiating Organization: Engineering District 8-0 Agreement Type: Project Specific Services Requested: Design and Misc Services Selection Process: Modified Part 1 Location Description State Route/Section Franklin County 7207/0 Part Name: Preliminary Engineering Project Description: Required preliminary engineering services may involve, but are not limited to: project management, administration and meetings; field surveys; environmental studies (including historic and archaeological resources investigations, hazardous waste evaluations, wetland identification, delineation and mitigation, Section 4(f) evaluations, PNDI and threatened and endangered species research); Categorical Exclusion Evaluation preparation; subsurface utility investigation; preliminary plans preparation (including roadway, maintenance and protection of traffic, signing and pavement marking, utility, drainage, right-of-way); field view(s); Design Review meeting submission; pavement design; preliminary erosion and sedimentation control plan/NPDES permit preparation; PUC and railroad coordination; Quality Development Preparation and ASTA Powerproject scheduling. Anticipated NTP: 06/2026 Project Time: Day and Night time Part 2 Location Description State Route/Section Franklin County 7207/0 Part Name: Final Design Project Description: Required final design services may include but are not limited to: project management, administration and meetings; field surveys; final plans preparation (including roadway, maintenance and protection of traffic, signing and pavement marking, utility, drainage, right-of-way); traffic signal plans, final structure plan preparation; utility coordination; final erosion and sedimentation and control plan/NPDES permit preparation; railroad coordination (including preparation of deliverables for railroad review) with Norfolk Southern, PUC coordination and all PUC deliverables ASTA Powerproject scheduling; and plans, specifications and estimate preparation. Anticipated NTP: 01/2028 Project Time: Day and Night time Part 3 Location Description State Route/Section Franklin County 7207/0 Part Name: Construction Consultation Project Description: Construction Consultation/Shop Drawing Review Anticipated NTP: 01/2030 Project Time: Day and Night time The method of contractor selection has not been determined at this time. PADOT - RFQ - Burnt Mill Road Bridge (T-642) Over Conodoguinet Creek

Conceptual

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
4
Bidding Soon
1,385
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

Burnt Mill Rd, Shippensburg, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.