Published February 27, 2026 at 7:00 PM
Updated March 7, 2026
Demolition, site work and addition to a power facility in Tarboro, North Carolina. Conceptual plans call for the addition of a power facility; for the demolition of a power facility; and for site work for a power facility.
Edgecombe-Martin County EMC is requesting pricing proposals from qualified firms to provide engineering design, material procurement, and construction management services for the upgrade of an existing medium voltage electrical substation in Edgecombe County, NC. The selected firm will be responsible for developing the technical design, procuring required materials, and managing contractor crews during construction to ensure the project is completed safely, on schedule, and in compliance with all applicable codes and standards. The project includes expanding an existing 115 kV / 13.2 kV substation footprint, installation of two new power transformers (minimum rating of 50/67/83 MVA), and may involve equipment replacement or expansion, protection and control upgrades, and associated civil and electrical work. The existing substation is expected to remain operational during portions of the upgrade. Responding firms should provide a detailed description of their proposed approach and associated costs for the following services: 1. Engineering & Design: Evaluate existing substation equipment and site conditions, develop conceptual and detailed design packages, prepare one-line diagrams, layouts, schematics, grounding plans, and material specifications, as well as protection, control, and SCADA design, ensuring compliance with relevant standards and providing engineering support during procurement and construction. 2. Material Procurement: Develop equipment and material lists, prepare technical specifications for vendor quotations, solicit and evaluate supplier quotes, coordinate with EMCEMC on vendor selection, schedule procurement to support construction sequencing, and handle logistics and delivery tracking. 3. Construction & Contractor Crew Management: Plan and sequence construction activities, oversee contractor crews, coordinate schedules, enforce safety requirements, manage quality control and progress reporting, and support commissioning, testing, and project closeout. Instructions to bidders: Include lump sum or itemized pricing for engineering, material procurement, and construction management services. Identify whether material costs are included or provided as pass-through expenses. List assumptions, exclusions, anticipated reimbursable expenses, and proposed project schedule. Question Deadline 03/11/2026 at 5:00 PM ET The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."
Conceptual
Power Plant
$15,000,000.00
Public - County
Addition, Demolition, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2026
To Be Determined, Tarboro, NC
Related To This Project
Tarboro, NC
Bid Date: Apr 15 2026
Tarboro, NC
Bid Date: Mar 24 2026
Tarboro, NC
Bid Date: May 15 2026
Tarboro, NC
Bid Date: May 12 2026
Tarboro, NC
--
Tarboro, NC
Bid Date: Mar 10 2026
Tarboro, NC
Bid Date: Feb 24 2026
Tarboro, NC
Bid Date: Nov 25 2025
Tarboro, NC
Bid Date: Dec 16 2025
Tarboro, NC
Bid Date: Nov 25 2025
Tarboro, NC
Bid Date: Nov 11 2025
Tarboro, NC
Bid Date: Nov 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.