Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 10, 2026 at 8:00 PM
Updated May 20, 2026
Site work and new construction of a medical facility in North Charleston, South Carolina. Completed plans call for the construction of a 100,000-square-foot medical facility.
The MUHA has estimated that the overall construction budget limitation, inclusive of professional design fees for the building will be approximately $40,000,000 to $45,000,000. Assume a design timeline of 9 months 1 month for programming 2 months for Schematic Design 3 months for Design Development and Early Site package/long lead items 2 months for core and shell CDs 1 additional month for full fit-up drawings Construction Drawings The Medical University Hospital Authority (MUHA) is Requesting Statements of Qualifications (SOQs) from qualified architectural design firms to design the expansion of the existing MUSC Children's Summey Medical Pavilion campus via a new state-of-the-art Medical Office Building to be located at 2250 Mall Drive in North Charleston SC. The facility will need to be substantially complete, including all punch lists and delivered to MUSC Health on or before December 1, 2027 for a January, 2028 occupancy and go-live (see first patients). This facility may be designed as a leaning facility on to the existing 100,000sf MOB-ASC or as a free-leaning facility. The proposed project plays a key role in an enabling project for the new Comprehensive Cancer Hospital. The expansion of the facility will allow key pediatric clinical functions to move off the Charleston Downtown peninsula to make way for the new Cancer Hospital. Question Deadline 03/04/2026 E-Mail Questions to: youki@musc.edu Architectural and Engineering design services for the design of a new approximately 100,000 square foot Medical Office Building on the existing MUSC Children's Summey Medical Pavilion campus located at 2250 Mall Drive in North Charleston, SC. No partial sets are allowed. Only those names on the plan holder list will receive addenda. Printed addenda, shipping/handling are additional. All downloads are final and no refunds will be given for digital goods. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Medical
$45,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2026
September 1, 2026
2250 Mall Dr, North Charleston, SC
Related To This Project
North Charleston, SC
Bid Date: Mar 12 2026
North Charleston, SC
Bid Date: Mar 31 2026
North Charleston, SC
Bid Date: Mar 19 2026
North Charleston, SC
Bid Date: Mar 05 2026
North Charleston, SC
Bid Date: Apr 06 2026
North Charleston, SC
Bid Date: Mar 31 2026
North Charleston, SC
Bid Date: Mar 31 2026
North Charleston, SC
Bid Date: Apr 08 2026
North Charleston, SC
Bid Date: Jun 02 2026
North Charleston, SC
Bid Date: Mar 17 2026
North Charleston, SC
--
North Charleston, SC
Bid Date: Feb 24 2026
North Charleston, SC
Bid Date: Feb 26 2026
North Charleston, SC
Bid Date: Feb 26 2026
North Charleston, SC
Bid Date: Feb 04 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
