Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 20, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a power facility in Key West Nas, Florida. Completed plans call for the renovation of a power facility.
To provide all labor, supervision, materials, equipment, supplies, tools, and incidentals required for the spalling repairs at US1 Substation, located at 5901 Overseas Highway (MM 5.9 Gulfside), Key West, FL 33040. The Construction Documents prepared by Artibus Design LLC (Artibus) are included as Attachment 1 to this Bid. Contractor shall adhere to the plans fully unless approved by KEYS and Artibus. US1 Substation will remain an active substation during the construction. Outage coordination may be requested by the contractor to KEYS' Project Manager 3 weeks prior to requested outage. All outages must be approved by KEYS. Construction 1. Contractor shall be licensed with a General Contractors License and insured. 2. Contractor must be qualified to work in substations. 3. Ensure industry specific, sound construction principles. 4. Contractor must adhere to the Construction Documents, Attachment 1 a. Contractor must provide product specifications for all proposed materials. b. KEYS must approve all fixtures prior to Contractor ordering. 5. Contractor shall be responsible for maintaining the site in a clean condition at all times. 6. Contractor shall not unreasonably impede, interfere or delay operations or activities at KEYS facilities. 7. Contractor will be responsible for all paving, concrete, and miscellaneous groundwork necessary to return any area disturbed by construction to its previous or better condition. 8. Successful Contractor must visit the site prior to construction and carefully examine each site location, areas for staging, and means and methods to and from site. 9. Provide all tools, equipment, materials and qualified personnel necessary for the undertakings herein described. 10. Contractor is responsible for disposal of any debris resulting from demolition or construction work. 11. Provide dumpsters and lavatory facilities, as required, on-site. Insurance Required Yes Question Deadline 03/27/2026 at 12:00 PM ET, must submit them in writing via email to purchasing@keysenergy.com
Post-Bid
Power Plant
$700,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2026
May 18, 2026
5901 Overseas Hwy, Key West Nas, FL
Related To This Project
Key West Nas, FL
Bid Date: Apr 30 2026
Key West Nas, FL
Bid Date: Mar 31 2026
Key West Nas, FL
--
Key West Nas, FL
Bid Date: Apr 21 2026
Key West Nas, FL
Bid Date: Mar 04 2026
Key West Nas, FL
Bid Date: Mar 12 2026
Key West Nas, FL
Bid Date: Apr 17 2026
Key West Nas, FL
--
Key West Nas, FL
Bid Date: Mar 23 2026
Key West Nas, FL
Bid Date: Mar 12 2026
Key West Nas, FL
Bid Date: Mar 09 2026
Key West Nas, FL
Bid Date: Mar 18 2026
Key West Nas, FL
Bid Date: Mar 11 2026
Key West Nas, FL
Bid Date: Apr 02 2026
Key West Nas, FL
Bid Date: Mar 20 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
