Published March 27, 2026 at 8:00 PM

Updated April 1, 2026

Site work for a water / sewer project in Miami, Florida. Completed plans call for site work for a water / sewer project.

This project involves providing all labor and equipment for the removal and replacement of existing 8-inch through 12-inch-diameter gravity sewer mains on a full-reach or point-repair basis. It also includes the removal and replacement of sewer laterals, including new lateral installations when necessary and approved by the Construction Manager, as well as all other related and miscellaneous items to ensure a complete, functional, and satisfactory gravity system installation. The project includes furnishing and installing sanitary sewer manholes, reconnecting existing service laterals and restoring pavement and other infrastructure affected during construction. Work also includes traffic control, temporary and permanent paving, proper disposal of removed materials, and other related tasks to ensure the project is completed successfully. The work shall be performed at various locations throughout Miami-Dade County, under different work orders, as ordered by the Department. This is a non-exclusive contract, and the actual number of Work Orders assigned will be at the Department's discretion and will depend only on its needs. At the time of Bid, the Bidder and all subcontractors must hold a valid, current, and active State and/or Miami-Dade County contractor's license consistent with the requirements of the Scope of Work. Bidders are required to submit proof that the firm has three separate independent crews available for the duration of the Contract, and must demonstrate at least five years of experience in similar scope and scale projects with supporting references for three completed projects within the past ten years. Bid submission must be electronic, through the Trimble Unity Construct (eBuilder) Bid Portal, with a hard copy sent to WASD postmarked within one business day of the bid submittal date. The original Bid Security must be delivered to WASD before the bids are opened. If multiple bids are submitted by the same company, all submitted bids will be rejected. The bid set includes electronic bid instructions. Question Deadline 03/24/2026 The RFI cut-off date is five (5) business days prior to the bid due date. The RFI deadline for this project is 03/20/2026 at 5:00 pm. This is a hard deadline, even if the bid due date is extended. ** bid date info : The bid set includes electronic bid instructions. Training on electronic bid submission is available every Monday from 9 - 10 and every Wednesday from 1 - 2. Email the Contracting Officer or paul.adams@miamidade.gov for further information or to schedule training on alternative dates.

Post-Bid

Water / Sewer

$2,234,741.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
1
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.