Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 10, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a development in Bergenfield, New Jersey. Working plans call for site work for a development.
The scope of work includes removal of accumulated sediment and debris from the Metzler Brook channel and the installation of limited streambank stabilization measures, as well as all other work necessary for the completion of the project, whether or not specifically described. All work is to be completed within 130 calendar days from the notice to proceed. Bid packets must be completed as designated in the contract documents, enclosed in a sealed envelope with the bidder's name, address, and the project name, addressed to the Qualified Purchasing Agent, and delivered to the Finance Department on the 3rd floor of Borough Hall. Each bid packet must also include a statement of consent of surety from an authorized surety company and either a bid bond or certified check for at least 10% of the total bid price, not to exceed $20,000. A performance and payment bond for the full project amount is required of the successful bidder. Vendors currently suspended, debarred, or disqualified are excluded from participating. Bidders must comply with all statutory requirements listed in the contract documents and plans, including business registration, the Prevailing Wage Act, public work contractor registration, and affirmative action requirements. The Borough of Bergenfield intends to award the project to the lowest responsible and responsive bidder and reserves the right to reject any or all bid packets as permitted by law. Bids are irrevocable for sixty calendar days after opening, unless otherwise extended. Doc Note :Bidders will be provided with a link to download the documents after receipt of proper notice and payment of a non-refundable charge of Twenty-Five Dollars ($25.00) payable to "T&M Associates" to defray the cost thereof or provided a paper set of the Contract Documents and Plans after receipt of proper notice and payment of a nonrefundable charge of One Hundred Dollars ($100.00) payable to "T&M Associates" to defray the cost thereof. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.
Final Planning
Conservation and Development
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
