BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Cheyenne, Wyoming. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000409251 Bid Intent Not Available The work is described in the Construction Plans and Specifications, attached hereto as Exhibit A and incorporated by this reference, the Special Provisions, attached hereto as Exhibit B and incorporated by this reference, and consists of the full depth reconstruction and widening of Chalk Bluff Road (CR 203) from US 85 (S. Greeley Hwy) to approximately 9 miles east of the US 85 and Chalk Bluff Road intersection. Major work items associated with the project will include construction, traffic control, removal/milling/recycling in place of all existing roadway surfacing materials, import borrow of embankment materials, cement treated subgrade, removal/replacement/lengthening of existing cross culverts and driveway culverts, import of crushed aggregate base course, hot mix bituminous asphalt paving, revegetation, striping, and sign installation. All construction will take place within the existing right-of-way or negotiated construction easements. A segment of the roadway improvements will occur within the Porter Draw Zone A FEMA mapped floodplain. Snow Control in relation to this project shall be in general alignment with Wyoming Department of Transportation Standard Specifications for Road and Bridge Construction Section 105.14 and 108.5, with final clarification further defined during the Contract award process. Question Deadline 03/16/2026 at 12:00 PM MT Questions are submitted online No, Questions regarding any portion of the RFP shall be submitted electronically, via email, to the Owner in writing to JD McCune, Procurement Manager, at jd.mccune@lararmiecountywy.gov. Replies will be issued by formal, written Addenda. Addenda will be delivered by the online to all parties recorded by the Owner as having received the Bidding Documents. Only questions answered by formal, written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required Bonding Requirements Buyer Requires E-Bonding - Bid Bond 5 % Laramie County Wyoming Government reserves the right to reject any and all Proposals or schedules, and to waive irregularities and formalities, and to award the contract in whole or in part in the best interest of Laramie County, Wyoming Government

Award

Roads / Highways

$600,000.00

Public - County

Paving, Site Work

246

12

10

8

Subscribe For Documents

119 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
62
Bidding Soon
667
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

May 7, 2026

Project location map

Chalk Bluff Rd, Cheyenne, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.